A platform for research: civil engineering, architecture and urbanism
Large steel formwork and combined formwork constituted by same
The invention discloses a large steel formwork. The formwork comprises a concrete contacting surface steel plate 1, the lower edge of the concrete contacting surface steel plate 1 is provided with a horizontal lower edge rib 6, a reinforcing vertical rib 13 is arranged at the position perpendicular to a central line of the horizontal lower edge rib 6, the lower edge rib 6 is provided with a through-wall bolt hole 11, the through-wall bolt hole 11 is only arranged on the lower edge rib 6 of the concrete contacting surface steel plate 1, a horizontal upper edge rib 5 is arranged on the upper edge of the concrete contacting surface steel plate 1, and vertical pins 12 matched with vertical pin sleeve clamps for sleeving and form erecting are arranged at the middle part and the end part of thehorizontal upper edge rib 5. According to the formwork, a combined assembly structure is used for meeting building industrialization requirements, a split bolt which is usually arranged on a panel isomitted, the using quantity of large steel formwork accessories is reduced, the construction cost is reduced, disassembly and assembly are convenient, a series of problems such as post-treatment of the through-wall bolt hole are reduced, the structure is simple, the actual operability is strong, and the formwork has the relatively huge economic and social values.
一种大型钢模板,包括:沾灰面钢板1;所述沾灰面钢板1的下边缘设置有水平下边肋6;垂直于所述水平下边肋6的中线位置处设置有加强立肋13;所述下边肋6上设置有穿墙螺栓孔11;所述穿墙螺栓孔11仅设置在所述沾灰面钢板1的下边肋6上;所述沾灰面钢板1的上边缘设置有水平上边肋5;所述水平上边肋5的中部和端部位置分别设置有配合立销套卡套支模的立销12。本发明在使用组合拼装结构符合建筑工业化要求,取消了通常设置在面板上的对拉螺栓,降低大型钢模板配件使用量,降低施工成本,拆装方便,减少后期处理穿墙螺栓孔等一系列问题结构简单,实际操作性强。具有较大的巨大经济和社会价值。
Large steel formwork and combined formwork constituted by same
The invention discloses a large steel formwork. The formwork comprises a concrete contacting surface steel plate 1, the lower edge of the concrete contacting surface steel plate 1 is provided with a horizontal lower edge rib 6, a reinforcing vertical rib 13 is arranged at the position perpendicular to a central line of the horizontal lower edge rib 6, the lower edge rib 6 is provided with a through-wall bolt hole 11, the through-wall bolt hole 11 is only arranged on the lower edge rib 6 of the concrete contacting surface steel plate 1, a horizontal upper edge rib 5 is arranged on the upper edge of the concrete contacting surface steel plate 1, and vertical pins 12 matched with vertical pin sleeve clamps for sleeving and form erecting are arranged at the middle part and the end part of thehorizontal upper edge rib 5. According to the formwork, a combined assembly structure is used for meeting building industrialization requirements, a split bolt which is usually arranged on a panel isomitted, the using quantity of large steel formwork accessories is reduced, the construction cost is reduced, disassembly and assembly are convenient, a series of problems such as post-treatment of the through-wall bolt hole are reduced, the structure is simple, the actual operability is strong, and the formwork has the relatively huge economic and social values.
一种大型钢模板,包括:沾灰面钢板1;所述沾灰面钢板1的下边缘设置有水平下边肋6;垂直于所述水平下边肋6的中线位置处设置有加强立肋13;所述下边肋6上设置有穿墙螺栓孔11;所述穿墙螺栓孔11仅设置在所述沾灰面钢板1的下边肋6上;所述沾灰面钢板1的上边缘设置有水平上边肋5;所述水平上边肋5的中部和端部位置分别设置有配合立销套卡套支模的立销12。本发明在使用组合拼装结构符合建筑工业化要求,取消了通常设置在面板上的对拉螺栓,降低大型钢模板配件使用量,降低施工成本,拆装方便,减少后期处理穿墙螺栓孔等一系列问题结构简单,实际操作性强。具有较大的巨大经济和社会价值。
Large steel formwork and combined formwork constituted by same
一种大型钢模板及其构成的组合模板
HUI YUQING (author)
2020-08-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork-formwork combined additive house building method
European Patent Office | 2024
|Profile for formwork and formwork frame and formwork including the same
European Patent Office | 2022
|