Wall body concrete pouring wall formwork construction method
The invention provides a wall body concrete pouring wall formwork construction method, and relates to the technical field of building construction. The wall body concrete pouring wall formwork construction method is completed through cooperation of a wall body concrete pouring wall formwork construction device. The wall body concrete pouring wall formwork construction device comprises a steel reinforcement framework arranged in a pouring wall, wherein the steel reinforcement framework is vertically fixed in the pouring wall, a plurality of first wall body forms of right-angle structures are symmetrically installed at the bottoms of the two sides of the steel reinforcement framework, and a through zipper hole is formed in the middle of each first wall body form. According to the method, through abdicating holes are formed in the middle of each first wall form and the middle of each second wall form at equal intervals, material baffles are installed in the abdicating holes, the abdicating holes are blocked through the material baffles, and poured concrete is prevented from leaking from the abdicating holes.
本发明提供了一种墙体混凝土浇筑墙模板施工方法,涉及建筑施工技术领域,该墙体混凝土浇筑墙模板施工方法采用一种墙体混凝土浇筑墙模板施工装置配合完成,该墙体混凝土浇筑墙模板施工装置包括设置在浇筑墙内部的钢筋骨架,所述钢筋骨架直立固定于浇筑墙的内部,所述钢筋骨架的两侧底部对称安装有若干个呈直角结构的第一墙体模板,每一个所述第一墙体模板的中部开设有贯通的拉链孔;本发明通过在每一个第一墙体模板的中部以及每一个第二墙体模板的中部等间距开设有贯通的让位孔,让位孔内安装有挡料板,通过挡料板对让位孔进行封堵,避免浇注的混凝土从让位孔内泄露。
Wall body concrete pouring wall formwork construction method
The invention provides a wall body concrete pouring wall formwork construction method, and relates to the technical field of building construction. The wall body concrete pouring wall formwork construction method is completed through cooperation of a wall body concrete pouring wall formwork construction device. The wall body concrete pouring wall formwork construction device comprises a steel reinforcement framework arranged in a pouring wall, wherein the steel reinforcement framework is vertically fixed in the pouring wall, a plurality of first wall body forms of right-angle structures are symmetrically installed at the bottoms of the two sides of the steel reinforcement framework, and a through zipper hole is formed in the middle of each first wall body form. According to the method, through abdicating holes are formed in the middle of each first wall form and the middle of each second wall form at equal intervals, material baffles are installed in the abdicating holes, the abdicating holes are blocked through the material baffles, and poured concrete is prevented from leaking from the abdicating holes.
本发明提供了一种墙体混凝土浇筑墙模板施工方法,涉及建筑施工技术领域,该墙体混凝土浇筑墙模板施工方法采用一种墙体混凝土浇筑墙模板施工装置配合完成,该墙体混凝土浇筑墙模板施工装置包括设置在浇筑墙内部的钢筋骨架,所述钢筋骨架直立固定于浇筑墙的内部,所述钢筋骨架的两侧底部对称安装有若干个呈直角结构的第一墙体模板,每一个所述第一墙体模板的中部开设有贯通的拉链孔;本发明通过在每一个第一墙体模板的中部以及每一个第二墙体模板的中部等间距开设有贯通的让位孔,让位孔内安装有挡料板,通过挡料板对让位孔进行封堵,避免浇注的混凝土从让位孔内泄露。
Wall body concrete pouring wall formwork construction method
一种墙体混凝土浇筑墙模板施工方法
JIN SHUANG (author) / SU MEILIN (author)
2020-08-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for formwork lifting pouring of concrete retaining wall
European Patent Office | 2021
|Concrete retaining wall pouring formwork structure and construction method thereof
European Patent Office | 2024
|Fabricated formwork-free concrete wall pouring technique and construction method
European Patent Office | 2021
|