Prefabricated ALC partition wall construction method
The invention discloses a prefabricated ALC partition wall construction method. The prefabricated ALC partition wall construction method comprises the following steps: S1, performing wallboard transportation and storage according to a predetermined stacking standard; S2, performing laying out of construction; S3, installing pipe clamps; S4, taking wallboards in place and performing adjustment; S5,fixing the pipe clamps, wherein the pipe clamps are connected and fixed to concrete beams or slabs of a roof through long shot nails; and S6, performing board seam repair and wall surface treatment,wherein the seams between the lower ends of the wallboards and the floor are densely filled with 1:3 cement mortar, wooden wedges are taken out after the mortar is hardened, the space of the wooden wedges is filled with homogeneous mortar, the upper end gaps of the wallboards and the connection between the wallboards and the column wall are filled with a PU foaming agent and PE rods, the surface is filled with repair mortar to be flat, and the wallboard splicing seams are filled with repair mortar to be flat. The fabricated ALC partition wall construction method has low construction cost, short construction period, less construction cost and high construction efficiency.
本发明公开了一种装配式ALC隔墙施工方法,包括S1:按照预定的码垛标准进行墙板搬运和保存;S2:施工放线;S3:安装管卡S4:墙板就位和调整;S5:固定管卡:管卡通过长射钉与屋顶的砼梁或板连接固定;S6:板缝修补及墙面处理,墙板下端与楼面处缝隙用1:3水泥砂浆嵌填密实,在砂浆结硬后取出木楔,且填补同质砂浆,墙板上端缝隙、墙板与柱墙连接处用PU发泡剂和PE棒填充,表面用修补砂浆补平;墙板拼缝用修补砂浆补平。本发明的目的在于提出一种施工成本低、施工周期短、施工成本少及施工效率高的装配式ALC隔墙施工方法。
Prefabricated ALC partition wall construction method
The invention discloses a prefabricated ALC partition wall construction method. The prefabricated ALC partition wall construction method comprises the following steps: S1, performing wallboard transportation and storage according to a predetermined stacking standard; S2, performing laying out of construction; S3, installing pipe clamps; S4, taking wallboards in place and performing adjustment; S5,fixing the pipe clamps, wherein the pipe clamps are connected and fixed to concrete beams or slabs of a roof through long shot nails; and S6, performing board seam repair and wall surface treatment,wherein the seams between the lower ends of the wallboards and the floor are densely filled with 1:3 cement mortar, wooden wedges are taken out after the mortar is hardened, the space of the wooden wedges is filled with homogeneous mortar, the upper end gaps of the wallboards and the connection between the wallboards and the column wall are filled with a PU foaming agent and PE rods, the surface is filled with repair mortar to be flat, and the wallboard splicing seams are filled with repair mortar to be flat. The fabricated ALC partition wall construction method has low construction cost, short construction period, less construction cost and high construction efficiency.
本发明公开了一种装配式ALC隔墙施工方法,包括S1:按照预定的码垛标准进行墙板搬运和保存;S2:施工放线;S3:安装管卡S4:墙板就位和调整;S5:固定管卡:管卡通过长射钉与屋顶的砼梁或板连接固定;S6:板缝修补及墙面处理,墙板下端与楼面处缝隙用1:3水泥砂浆嵌填密实,在砂浆结硬后取出木楔,且填补同质砂浆,墙板上端缝隙、墙板与柱墙连接处用PU发泡剂和PE棒填充,表面用修补砂浆补平;墙板拼缝用修补砂浆补平。本发明的目的在于提出一种施工成本低、施工周期短、施工成本少及施工效率高的装配式ALC隔墙施工方法。
Prefabricated ALC partition wall construction method
装配式ALC隔墙施工方法
ZHAO YANWEI (author) / LIU ZHONG (author) / GAO FEI (author)
2020-08-25
Patent
Electronic Resource
Chinese
Prefabricated assembled concrete mid-partition wall and construction method thereof
European Patent Office | 2022
|Prefabricated pipeline prefabricated partition wall batten and manufacturing method thereof
European Patent Office | 2021
|Prefabricated ALC outer partition wall mounting structure and construction method thereof
European Patent Office | 2023
|