"Pile first method" interpolated jacket foundation construction system for implantable rock-socketed pile
This application discloses a "pile first method" interpolated jacket foundation construction system for an implantable rock-socketed pile. The construction system comprises a steel pile casing, a steel pipe pile prefabricated with pile core bottom sealing concrete and a jacket; the steel pile casing is sank to a preset position, the steel pipe pile prefabricated with the pile core bottom sealing concrete is implanted in the inner side of the steel pile casting, and a first annular space among the bottom of the steel pipe pile, the steel pipe pile and a rock-socketed hole wall and a second annular space between the steel pipe pile and an overburden layer are both prefabricated with grouting pipelines; and after the first annular space and the second annular space are grouted, the tip part of a pile leg column of the jacket is inserted into the steel pipe pile and fixedly connected with the steel pipe pile, and a third annular space is prefabricated with a grouting pipeline. This systemproposes to pre-pour pile core the concrete to seal the bottom in the pile before the steel pipe pile is shipped, the construction risk is reduced, a offshore construction window is saved, the construction quality of the pile core concrete and the grouting construction quality of a rock-socketed section are ensured, and at the same time, the grouting quality of the rock-socketed section is ensured.
本申请公开了植入式嵌岩桩的“先桩法”内插式导管架基础施工系统,施工系统包括:钢护筒、预制有桩芯封底混凝土的钢管桩和导管架;将钢护筒沉桩至预设位置,预制有桩芯封底混凝土的钢管桩植入钢护筒内侧,钢管桩底部、钢管桩和嵌岩孔壁之间的第一环形空间、钢管桩和覆盖层之间的第二环形空间均预制有灌浆管线;待第一环形空间和第二环形空间灌浆完成后,将导管架的桩腿柱插尖部位插入钢管桩内并与钢管桩固定连接,第三环形空间预制有灌浆管线。本申请提出了在钢管桩出运前预先浇筑桩芯混凝土进行桩内封底,不仅降低了施工风险,节省了海上施工窗口,更保证了桩芯混凝土施工质量和嵌岩段灌浆施工质量,同时确保嵌岩段灌浆质量。
"Pile first method" interpolated jacket foundation construction system for implantable rock-socketed pile
This application discloses a "pile first method" interpolated jacket foundation construction system for an implantable rock-socketed pile. The construction system comprises a steel pile casing, a steel pipe pile prefabricated with pile core bottom sealing concrete and a jacket; the steel pile casing is sank to a preset position, the steel pipe pile prefabricated with the pile core bottom sealing concrete is implanted in the inner side of the steel pile casting, and a first annular space among the bottom of the steel pipe pile, the steel pipe pile and a rock-socketed hole wall and a second annular space between the steel pipe pile and an overburden layer are both prefabricated with grouting pipelines; and after the first annular space and the second annular space are grouted, the tip part of a pile leg column of the jacket is inserted into the steel pipe pile and fixedly connected with the steel pipe pile, and a third annular space is prefabricated with a grouting pipeline. This systemproposes to pre-pour pile core the concrete to seal the bottom in the pile before the steel pipe pile is shipped, the construction risk is reduced, a offshore construction window is saved, the construction quality of the pile core concrete and the grouting construction quality of a rock-socketed section are ensured, and at the same time, the grouting quality of the rock-socketed section is ensured.
本申请公开了植入式嵌岩桩的“先桩法”内插式导管架基础施工系统,施工系统包括:钢护筒、预制有桩芯封底混凝土的钢管桩和导管架;将钢护筒沉桩至预设位置,预制有桩芯封底混凝土的钢管桩植入钢护筒内侧,钢管桩底部、钢管桩和嵌岩孔壁之间的第一环形空间、钢管桩和覆盖层之间的第二环形空间均预制有灌浆管线;待第一环形空间和第二环形空间灌浆完成后,将导管架的桩腿柱插尖部位插入钢管桩内并与钢管桩固定连接,第三环形空间预制有灌浆管线。本申请提出了在钢管桩出运前预先浇筑桩芯混凝土进行桩内封底,不仅降低了施工风险,节省了海上施工窗口,更保证了桩芯混凝土施工质量和嵌岩段灌浆施工质量,同时确保嵌岩段灌浆质量。
"Pile first method" interpolated jacket foundation construction system for implantable rock-socketed pile
植入式嵌岩桩的“先桩法”内插式导管架基础施工系统
PAN XIAOWEI (author) / WANG DONGDONG (author) / SU YUDONG (author) / WU HAIBING (author) / WANG DAPENG (author) / ZHANG YUERAN (author) / GAO JIANYUE (author) / LYU DONGLIANG (author) / WANG YANSONG (author) / XU WEISHI (author)
2020-08-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Foundation construction method of offshore special-shaped root rock-socketed jacket pile
European Patent Office | 2024
|Implanted rock-socketed three-pile jacket and construction method thereof
European Patent Office | 2022
|Rock-socketed hollow precast pile and rock-socketed construction method using precast pile
European Patent Office | 2021
|Novel rock-socketed-preventing jacket pile foundation suitable for large megawatt fan
European Patent Office | 2023
|