A platform for research: civil engineering, architecture and urbanism
Cable-stayed bridge cable beam anchoring structure and cable-stayed bridge
The invention discloses a cable-stayed bridge cable beam anchoring structure and a cable-stayed bridge. According to the cable-stayed bridge cable beam anchoring structure disclosed in the invention,an anchor pipe is connected with a main beam through bolts, the anchor pipe is provided with a first connecting plate and a second connecting plate, a first beam connecting plate is arranged on a topplate of the main beam, a second beam connecting plate is arranged on a bottom plate of the main beam, the first connecting plate is connected with the first beam connecting plate through a pluralityof bolts, and the second connecting plate is connected with the second beam connecting plate through a plurality of bolts. The cable-stayed bridge comprises the cable-stayed bridge cable beam anchoring structure. The technical scheme has the following advantages that bolting is mainly adopted, and welding temperature stress is avoided; cable force dispersion is fast, and force lines are clear; construction is simple, and quality is easy to guarantee.
本发明的斜拉桥索梁锚固结构以及斜拉桥,其中本发明的斜拉桥索梁锚固结构,锚管与主梁连接采用螺栓连接,锚管设置第一连接板、第二连接板,主梁顶板上设置第一梁连接板,主梁底板上设置第二梁连接板,第一连接板与第一梁连接板通过多个螺栓连接,第二连接板与第二梁连接板通过多个螺栓连接。本发明的斜拉桥,包括本发明的斜拉桥索梁锚固结构。本发明的技术方案具有以下优点:以栓接为主,避免焊接温度应力;索力分散快,力线明确;施工简便,质量易于保证。
Cable-stayed bridge cable beam anchoring structure and cable-stayed bridge
The invention discloses a cable-stayed bridge cable beam anchoring structure and a cable-stayed bridge. According to the cable-stayed bridge cable beam anchoring structure disclosed in the invention,an anchor pipe is connected with a main beam through bolts, the anchor pipe is provided with a first connecting plate and a second connecting plate, a first beam connecting plate is arranged on a topplate of the main beam, a second beam connecting plate is arranged on a bottom plate of the main beam, the first connecting plate is connected with the first beam connecting plate through a pluralityof bolts, and the second connecting plate is connected with the second beam connecting plate through a plurality of bolts. The cable-stayed bridge comprises the cable-stayed bridge cable beam anchoring structure. The technical scheme has the following advantages that bolting is mainly adopted, and welding temperature stress is avoided; cable force dispersion is fast, and force lines are clear; construction is simple, and quality is easy to guarantee.
本发明的斜拉桥索梁锚固结构以及斜拉桥,其中本发明的斜拉桥索梁锚固结构,锚管与主梁连接采用螺栓连接,锚管设置第一连接板、第二连接板,主梁顶板上设置第一梁连接板,主梁底板上设置第二梁连接板,第一连接板与第一梁连接板通过多个螺栓连接,第二连接板与第二梁连接板通过多个螺栓连接。本发明的斜拉桥,包括本发明的斜拉桥索梁锚固结构。本发明的技术方案具有以下优点:以栓接为主,避免焊接温度应力;索力分散快,力线明确;施工简便,质量易于保证。
Cable-stayed bridge cable beam anchoring structure and cable-stayed bridge
斜拉桥索梁锚固结构以及斜拉桥
LIU SHUANG (author) / HUANG YUNYONG (author) / NIE YUDONG (author) / SHI ZHENWU (author) / ZHANG MING (author) / LIU GUOFENG (author) / OUYANG MING (author) / LI CHANG (author) / TENG LIANG (author)
2020-09-01
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
External anchoring structure of cable-stayed bridge cable tower body and cable-stayed bridge
European Patent Office | 2023
|Prestressed concrete cable-stayed bridge cable beam anchoring structure and bridge
European Patent Office | 2023
|Cable-stayed bridge inhaul cable anchoring structural member
European Patent Office | 2024
|Cable-stayed bridge steel-concrete combined cable and beam anchoring structure
European Patent Office | 2015
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|