Building stone-like coating outer wall structure and construction process thereof
The invention discloses a building stone-like coating outer wall structure. The structure sequentially comprises a base wall surface, an interface agent layer, a mortar broomed layer, a waterproof mortar leveling layer, a flexible putty layer, a solid primer layer and a stone-like coating layer from inside to outside. The following steps during specific construction of the structure are included:A, steel wire meshes are fully hung at the beam column portion of the base wall surface, and then each of the steel wire meshes and the base wall surface is coated with a layer of interface agent; B,after the interface agent is applied, and then naturally dried for 10-30 minutes; C, after drying is completed, mortar is applied to an interface agent outer layer, and surface brooming is conducted to form the mortar broomed layer; D, after construction of the mortar broomed layer is completed, the waterproof mortar leveling layer is laid, a layer of alkali-resistant fiberglass mesh cloth is fully hung during construction of the waterproof mortar leveling layer; E, after construction of the waterproof mortar leveling layer is completed, two flexible putty layers are applied; and F, after theabove construction is completed, construction of the solid primer layer is conducted, and after construction is completed, the stone-like coating layer construction is conducted.
本发明公开了一种建筑真石漆外墙结构,由内到外依次包括基础墙面、界面剂层、砂浆扫毛层、防水砂浆找平层、柔性腻子层、固体底漆层和真石漆层,具体施工时包括如下步骤:包括如下步骤:A、在基础墙面的梁柱部位满挂钢丝网片,然后在钢丝网片及基础墙面上涂刷一层界面剂,B、待界面剂涂刷完成自然干燥10~30分钟,C、干燥完成后在界面剂外层涂抹砂浆并进行表面扫毛形成砂浆扫毛层,D、砂浆扫毛层完工后进行防水砂浆找平层的铺设,所述防水砂浆找平层施工时满挂一层耐碱玻纤网格布,E、待防水砂浆找平层施工完成后,刮涂两层柔性腻子层,F、上述施工完成后,进行固体底漆层施工,施工完成后在进行真石漆层施工。
Building stone-like coating outer wall structure and construction process thereof
The invention discloses a building stone-like coating outer wall structure. The structure sequentially comprises a base wall surface, an interface agent layer, a mortar broomed layer, a waterproof mortar leveling layer, a flexible putty layer, a solid primer layer and a stone-like coating layer from inside to outside. The following steps during specific construction of the structure are included:A, steel wire meshes are fully hung at the beam column portion of the base wall surface, and then each of the steel wire meshes and the base wall surface is coated with a layer of interface agent; B,after the interface agent is applied, and then naturally dried for 10-30 minutes; C, after drying is completed, mortar is applied to an interface agent outer layer, and surface brooming is conducted to form the mortar broomed layer; D, after construction of the mortar broomed layer is completed, the waterproof mortar leveling layer is laid, a layer of alkali-resistant fiberglass mesh cloth is fully hung during construction of the waterproof mortar leveling layer; E, after construction of the waterproof mortar leveling layer is completed, two flexible putty layers are applied; and F, after theabove construction is completed, construction of the solid primer layer is conducted, and after construction is completed, the stone-like coating layer construction is conducted.
本发明公开了一种建筑真石漆外墙结构,由内到外依次包括基础墙面、界面剂层、砂浆扫毛层、防水砂浆找平层、柔性腻子层、固体底漆层和真石漆层,具体施工时包括如下步骤:包括如下步骤:A、在基础墙面的梁柱部位满挂钢丝网片,然后在钢丝网片及基础墙面上涂刷一层界面剂,B、待界面剂涂刷完成自然干燥10~30分钟,C、干燥完成后在界面剂外层涂抹砂浆并进行表面扫毛形成砂浆扫毛层,D、砂浆扫毛层完工后进行防水砂浆找平层的铺设,所述防水砂浆找平层施工时满挂一层耐碱玻纤网格布,E、待防水砂浆找平层施工完成后,刮涂两层柔性腻子层,F、上述施工完成后,进行固体底漆层施工,施工完成后在进行真石漆层施工。
Building stone-like coating outer wall structure and construction process thereof
一种建筑真石漆外墙结构及其施工工艺
2020-09-01
Patent
Electronic Resource
Chinese
Construction process for stone-like paint on outer wall of building
European Patent Office | 2021
|Wall surface stone-like coating construction device and construction process thereof
European Patent Office | 2021
|European Patent Office | 2018
|European Patent Office | 2024
|