A platform for research: civil engineering, architecture and urbanism
The invention discloses a drainage device for construction site foundation pit construction. The drainage device comprises a base plate, a connecting base and a water collection tank. The middle position of the top end of the base plate is fixedly connected with a water pump. Adjusting columns are arranged inside fixed bases. The adjusting columns are internally and fixedly connected with adjusting holes. One ends of the adjusting columns are fixedly connected with adjusting bolts. According to the drainage device, the bottom end of the fixed bases are fixedly connected with the top end of thewater collection tank; the top ends of the adjusting columns are fixedly connected with the bottom end of the connecting base; the adjusting bolts are screwed and loosened and then are fixed to the different adjusting holes; the supporting length of the adjusting columns can be changed when the adjusting bolts and the adjusting holes are fixed; as a result of changes of the position relation, thedistance between the connecting base and the water collection tank is changed, and the extension depth of the water collection tank is changed; and accordingly, the overall adjustability is improved,and the drainage device adapts to more working environments.
本发明公开了一种建筑工地地基坑施工用排水装置,包括底板、连接底座和集水箱,所述底板顶端的中间位置处固定连接有抽水泵,所述固定座的内部设置有调节柱,且调节柱的内部固定连接有调节孔,所述调节柱的一端固定连接有调节螺栓。本发明通过将固定座的底端与集水箱的顶端固定连接,然后将调节柱的顶端与连接底座的底端固定连接,转动调节螺栓,让调节螺栓松动后与不同的调节孔相互固定,在和调节孔固定的过程中可以改变调节柱的支撑长短,由于位置关系的改变,使得连接底座与集水箱之间的距离发生了改变,从而改变了集水箱的可深入长度,从而提高了整体的可调节性,适应了更加多的工作环境。
The invention discloses a drainage device for construction site foundation pit construction. The drainage device comprises a base plate, a connecting base and a water collection tank. The middle position of the top end of the base plate is fixedly connected with a water pump. Adjusting columns are arranged inside fixed bases. The adjusting columns are internally and fixedly connected with adjusting holes. One ends of the adjusting columns are fixedly connected with adjusting bolts. According to the drainage device, the bottom end of the fixed bases are fixedly connected with the top end of thewater collection tank; the top ends of the adjusting columns are fixedly connected with the bottom end of the connecting base; the adjusting bolts are screwed and loosened and then are fixed to the different adjusting holes; the supporting length of the adjusting columns can be changed when the adjusting bolts and the adjusting holes are fixed; as a result of changes of the position relation, thedistance between the connecting base and the water collection tank is changed, and the extension depth of the water collection tank is changed; and accordingly, the overall adjustability is improved,and the drainage device adapts to more working environments.
本发明公开了一种建筑工地地基坑施工用排水装置,包括底板、连接底座和集水箱,所述底板顶端的中间位置处固定连接有抽水泵,所述固定座的内部设置有调节柱,且调节柱的内部固定连接有调节孔,所述调节柱的一端固定连接有调节螺栓。本发明通过将固定座的底端与集水箱的顶端固定连接,然后将调节柱的顶端与连接底座的底端固定连接,转动调节螺栓,让调节螺栓松动后与不同的调节孔相互固定,在和调节孔固定的过程中可以改变调节柱的支撑长短,由于位置关系的改变,使得连接底座与集水箱之间的距离发生了改变,从而改变了集水箱的可深入长度,从而提高了整体的可调节性,适应了更加多的工作环境。
Drainage device for construction site foundation pit construction
一种建筑工地地基坑施工用排水装置
2020-09-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Drainage device for foundation pit construction of construction site
European Patent Office | 2022
|Novel drainage device applied to construction site foundation pit
European Patent Office | 2021
|European Patent Office | 2022
|