A platform for research: civil engineering, architecture and urbanism
Assembly type bridge prefabricated pier form-stripping equipment and prefabricated pier form-stripping process
The invention relates to assembly type bridge prefabricated pier form-stripping equipment and a prefabricated pier form-stripping process. The assembly type bridge prefabricated pier form-stripping equipment comprises a jacking mechanism, a form-stripping mechanism and a collecting mechanism. The assembly type bridge prefabricated pier form-stripping equipment can solve the problems in a prefabricated pier form-stripping process: a, in most of conventional form-stripping operation processes, a form is stripped from a cast and moulded pier directly through a form-stripping tool, and the pier cannot be normally used as a concrete stripping phenomenon is directly caused by form stripping if concrete is possibly bonded with the form in a moulding process; and b, in the conventional form-stripping operation process, the form directly drops into a collecting frame after being stripped, and the form generates collision with the collecting frame in a dropping process to cause damages on the form; and meanwhile, the form collecting is disorderly, and space usage is relatively great.
本发明涉及一种装配式桥梁预制桥墩拆模设备及预制桥墩拆模工艺,包括顶升机构、拆模机构以及收集机构。本发明可以解决预制桥墩在拆模作业过程中所存在的以下难题:a大部分传统拆模作业过程中,通过拆模工具直接将模具从已浇筑成型的桥墩上拆卸,由于混凝土在成型过程中可能会与模具发生粘接,直接通过磨具拆除会导致混凝土发生剥落现象,导致桥墩不能正常使用,b传统拆模作业过程中,模具在拆卸之后直接掉落到收集框中,模具在掉落过程中会与收集框发生碰撞,造成模具的损坏,同时模具收集杂乱,占用空间较大。
Assembly type bridge prefabricated pier form-stripping equipment and prefabricated pier form-stripping process
The invention relates to assembly type bridge prefabricated pier form-stripping equipment and a prefabricated pier form-stripping process. The assembly type bridge prefabricated pier form-stripping equipment comprises a jacking mechanism, a form-stripping mechanism and a collecting mechanism. The assembly type bridge prefabricated pier form-stripping equipment can solve the problems in a prefabricated pier form-stripping process: a, in most of conventional form-stripping operation processes, a form is stripped from a cast and moulded pier directly through a form-stripping tool, and the pier cannot be normally used as a concrete stripping phenomenon is directly caused by form stripping if concrete is possibly bonded with the form in a moulding process; and b, in the conventional form-stripping operation process, the form directly drops into a collecting frame after being stripped, and the form generates collision with the collecting frame in a dropping process to cause damages on the form; and meanwhile, the form collecting is disorderly, and space usage is relatively great.
本发明涉及一种装配式桥梁预制桥墩拆模设备及预制桥墩拆模工艺,包括顶升机构、拆模机构以及收集机构。本发明可以解决预制桥墩在拆模作业过程中所存在的以下难题:a大部分传统拆模作业过程中,通过拆模工具直接将模具从已浇筑成型的桥墩上拆卸,由于混凝土在成型过程中可能会与模具发生粘接,直接通过磨具拆除会导致混凝土发生剥落现象,导致桥墩不能正常使用,b传统拆模作业过程中,模具在拆卸之后直接掉落到收集框中,模具在掉落过程中会与收集框发生碰撞,造成模具的损坏,同时模具收集杂乱,占用空间较大。
Assembly type bridge prefabricated pier form-stripping equipment and prefabricated pier form-stripping process
一种装配式桥梁预制桥墩拆模设备及预制桥墩拆模工艺
FAN MANXIANG (author)
2020-09-11
Patent
Electronic Resource
Chinese