A platform for research: civil engineering, architecture and urbanism
Egg-shaped drainage ditch assembly, municipal rainwater system and construction method
The invention relates to an egg-shaped drainage ditch assembly, a municipal rainwater system and a construction method. The egg-shaped drainage ditch assembly is used for being arranged between a green belt and a motorway or between a sidewalk and a bicycle lane. The egg-shaped drainage ditch assembly comprise a plurality of spliced first egg-shaped drainage ditches and a plurality of second egg-shaped drainage ditches, the second egg-shaped drainage ditches are arranged on one side of a municipal facility, curb stones are arranged on the top surfaces of the first egg-shaped drainage ditches and the second egg-shaped drainage ditches, a pipeline embedded structure is arranged on the bottom surfaces of the first egg-shaped drainage ditches, and a plurality of embedded pipe channels are arranged in the pipeline embedded structure. According to the drainage ditch assembly in the invention, the road construction period is shortened, and the influence of cables on plants in the green belt is avoided.
本发明涉及一种卵型排水沟总成、市政雨水系统及施工方法,用于设置在绿化带与机动车道之间或人行道与非机动车道之间,包括多个拼接的第一卵型排水沟和多个第二卵型排水沟,第二卵型排水沟用于设置在市政设施的一侧,第一卵型排水沟和第二卵型排水沟顶面均设置有路缘石,第一卵型排水沟的底面设置有管线预埋结构,管线预埋结构中设置有多个预埋管槽,本发明的排水沟总成缩短了道路施工周期,避免了线缆对绿化带植物的影响。
Egg-shaped drainage ditch assembly, municipal rainwater system and construction method
The invention relates to an egg-shaped drainage ditch assembly, a municipal rainwater system and a construction method. The egg-shaped drainage ditch assembly is used for being arranged between a green belt and a motorway or between a sidewalk and a bicycle lane. The egg-shaped drainage ditch assembly comprise a plurality of spliced first egg-shaped drainage ditches and a plurality of second egg-shaped drainage ditches, the second egg-shaped drainage ditches are arranged on one side of a municipal facility, curb stones are arranged on the top surfaces of the first egg-shaped drainage ditches and the second egg-shaped drainage ditches, a pipeline embedded structure is arranged on the bottom surfaces of the first egg-shaped drainage ditches, and a plurality of embedded pipe channels are arranged in the pipeline embedded structure. According to the drainage ditch assembly in the invention, the road construction period is shortened, and the influence of cables on plants in the green belt is avoided.
本发明涉及一种卵型排水沟总成、市政雨水系统及施工方法,用于设置在绿化带与机动车道之间或人行道与非机动车道之间,包括多个拼接的第一卵型排水沟和多个第二卵型排水沟,第二卵型排水沟用于设置在市政设施的一侧,第一卵型排水沟和第二卵型排水沟顶面均设置有路缘石,第一卵型排水沟的底面设置有管线预埋结构,管线预埋结构中设置有多个预埋管槽,本发明的排水沟总成缩短了道路施工周期,避免了线缆对绿化带植物的影响。
Egg-shaped drainage ditch assembly, municipal rainwater system and construction method
一种卵型排水沟总成、市政雨水系统及施工方法
WANG JING (author) / WANG SHU (author) / ZHENG MINGWAN (author) / DAI XIN (author) / WANG MENG (author) / WANG DONGYANG (author) / ZHAO YANG (author) / XU KAI (author) / HAN RUI (author) / XING BANGNING (author)
2020-09-15
Patent
Electronic Resource
Chinese