A platform for research: civil engineering, architecture and urbanism
Indoor suspended ceiling lightgage steel joist frame
The invention relates to an indoor suspended ceiling lightgage steel joist frame. The frame comprises a joist frame body, an edge joist, a lightgage steel joist, a connecting suspender and four positioning devices, wherein the outer wall of the joist frame is connected with the edge joist through a connecting piece, the upper end of the joist frame is connected with the lightgage steel joist through the connecting suspender, and four corners of the joist frame are connected with the four positioning devices. The frame can solve the problems that during suspended ceiling installation, for different rooms of the same house type, due to the fact that the number of load-bearing columns of each room is different, workers need to perform on-site measurement and cutting, and perform targeted installation, the process is tedious, the overall installation efficiency is difficult to improve, during installation, a lightgage steel joist is often locked on a roof through a suspender, then the lightgage steel joist is connected with a joist main frame through a connecting piece, a threaded connection locking is most adopted during instllation, so that single installation efficiency is slow, andthe efficiency can be improved through cooperation of the multi-workers.
本发明涉及一种室内吊顶轻钢龙骨架,包括龙骨架、边龙骨、轻钢龙骨、连接吊杆和四个定位装置,所述的龙骨架的外壁与边龙骨之间通过连接件连接,龙骨架的上端与轻钢龙骨之间通过连接吊杆连接,龙骨架的四个拐角处与四个定位装置连接。本发明可以解决吊顶安装时,在对相同户型的不同房间时,由于各房间的承重柱数量不同,工作人员需要进行现场测量切割,进行针对性安装,过程较为繁琐,整体的安装效率难以得到提高,安装时,轻钢龙骨往往通过吊杆与屋顶进行锁定,再通过连接件将轻钢龙骨与龙骨主架进行连接,安装时多为螺纹连接锁紧的方式,单个安装的效率较慢,需要多人配合才能提升效率等问题。
Indoor suspended ceiling lightgage steel joist frame
The invention relates to an indoor suspended ceiling lightgage steel joist frame. The frame comprises a joist frame body, an edge joist, a lightgage steel joist, a connecting suspender and four positioning devices, wherein the outer wall of the joist frame is connected with the edge joist through a connecting piece, the upper end of the joist frame is connected with the lightgage steel joist through the connecting suspender, and four corners of the joist frame are connected with the four positioning devices. The frame can solve the problems that during suspended ceiling installation, for different rooms of the same house type, due to the fact that the number of load-bearing columns of each room is different, workers need to perform on-site measurement and cutting, and perform targeted installation, the process is tedious, the overall installation efficiency is difficult to improve, during installation, a lightgage steel joist is often locked on a roof through a suspender, then the lightgage steel joist is connected with a joist main frame through a connecting piece, a threaded connection locking is most adopted during instllation, so that single installation efficiency is slow, andthe efficiency can be improved through cooperation of the multi-workers.
本发明涉及一种室内吊顶轻钢龙骨架,包括龙骨架、边龙骨、轻钢龙骨、连接吊杆和四个定位装置,所述的龙骨架的外壁与边龙骨之间通过连接件连接,龙骨架的上端与轻钢龙骨之间通过连接吊杆连接,龙骨架的四个拐角处与四个定位装置连接。本发明可以解决吊顶安装时,在对相同户型的不同房间时,由于各房间的承重柱数量不同,工作人员需要进行现场测量切割,进行针对性安装,过程较为繁琐,整体的安装效率难以得到提高,安装时,轻钢龙骨往往通过吊杆与屋顶进行锁定,再通过连接件将轻钢龙骨与龙骨主架进行连接,安装时多为螺纹连接锁紧的方式,单个安装的效率较慢,需要多人配合才能提升效率等问题。
Indoor suspended ceiling lightgage steel joist frame
一种室内吊顶轻钢龙骨架
WANG JIONGWEI (author)
2020-09-15
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CEILING JOIST ATTACHMENT MEMBER AND SUSPENDED CEILING STRUCTURE
European Patent Office | 2022
|