A platform for research: civil engineering, architecture and urbanism
The invention relates to a trowelling device, in particular to a concrete wall trowelling device for a building. According to the concrete wall trowelling device for the building, the height and the direction can be adjusted. The concrete wall trowelling device for the building comprises a mounting plate, wheels, a rotating assembly, a lifting assembly and a shoveling assembly; the mounting plateis used for installing the whole device; the wheels are installed on the mounting plate; the rotating assembly is installed on the mounting plate, and the angle is adjusted in a rotating mode; the lifting assembly is installed on the rotating assembly and ascends and descends in a sliding mode; and the shoveling assembly is installed on the lifting assembly and shovels through continuous contact.According to the concrete wall trowelling device for the building, through cooperation of a gear ring and a gear, effective adjustment can be conducted according to different direction angles of the concrete wall, through cooperation of a vertical rod and a square sliding sleeve, the height can be adjusted according to the height of the concrete wall, and the practicability of the equipment is improved.
本发明涉及一种抹平装置,尤其涉及一种建筑用的混凝土墙抹平装置。本发明要解决的技术问题是:提供一种可以调整高度、调整方向的建筑用的混凝土墙抹平装置。一种建筑用的混凝土墙抹平装置,包括有:安装板,用于安装整个装置;轮子,安装在安装板上;旋转组件,安装在安装板上,通过旋转方式进行调整角度;升降组件,安装在旋转组件上,通过滑动方式进行升降;铲除组件,安装在升降组件上,通过持续接触进行铲除。本发明通过齿圈和齿轮配合,可以根据混凝土墙不同的方向角度进行有效调整,通过竖杆和方形滑套配合,可以根据混泥土墙的高矮进行调节高度,增加了设备的实用性。
The invention relates to a trowelling device, in particular to a concrete wall trowelling device for a building. According to the concrete wall trowelling device for the building, the height and the direction can be adjusted. The concrete wall trowelling device for the building comprises a mounting plate, wheels, a rotating assembly, a lifting assembly and a shoveling assembly; the mounting plateis used for installing the whole device; the wheels are installed on the mounting plate; the rotating assembly is installed on the mounting plate, and the angle is adjusted in a rotating mode; the lifting assembly is installed on the rotating assembly and ascends and descends in a sliding mode; and the shoveling assembly is installed on the lifting assembly and shovels through continuous contact.According to the concrete wall trowelling device for the building, through cooperation of a gear ring and a gear, effective adjustment can be conducted according to different direction angles of the concrete wall, through cooperation of a vertical rod and a square sliding sleeve, the height can be adjusted according to the height of the concrete wall, and the practicability of the equipment is improved.
本发明涉及一种抹平装置,尤其涉及一种建筑用的混凝土墙抹平装置。本发明要解决的技术问题是:提供一种可以调整高度、调整方向的建筑用的混凝土墙抹平装置。一种建筑用的混凝土墙抹平装置,包括有:安装板,用于安装整个装置;轮子,安装在安装板上;旋转组件,安装在安装板上,通过旋转方式进行调整角度;升降组件,安装在旋转组件上,通过滑动方式进行升降;铲除组件,安装在升降组件上,通过持续接触进行铲除。本发明通过齿圈和齿轮配合,可以根据混凝土墙不同的方向角度进行有效调整,通过竖杆和方形滑套配合,可以根据混泥土墙的高矮进行调节高度,增加了设备的实用性。
Concrete wall trowelling device for building
一种建筑用的混凝土墙抹平装置
WEN LEGUI (author)
2020-10-02
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
European Patent Office | 2023
|Concrete trowelling device and trowelling method thereof
European Patent Office | 2023
|