A platform for research: civil engineering, architecture and urbanism
Mounting method of barrel-type foundation
The invention relates to the technical field of offshore wind power operation, in particular to a mounting method of a barrel-type foundation. The mounting method comprises the steps that the barrel-type foundation is hoisted into water in a first area; the barrel-type foundation is drawn to a second area, wherein the water depth of the second area is smaller than that of the first area; and the barrel-type foundation is sunken to be mounted in the second area. Due to the fact that the water depth of the first area is large, the barrel-type foundation can be transported to the first area through a large barge, the barrel-type foundation is hoisted into water through a large floating crane, then the barrel-type foundation is drawn to the second area, and the barrel-type foundation is sunkento be mounted in the second area. The mounting method can be suitable for mounting of the barrel-type foundation in the place with the small water depth.
本发明涉及海上风电作业技术领域,具体涉及一种筒型基础安装方法,包括:在第一区域处将筒型基础吊装下水;将所述筒型基础拖带至第二区域,其中所述第二区域的水深小于所述第一区域的水深;在所述第二区域处,使所述筒型基础下沉安装。由于第一区域的水深较大,能够利用大型驳船将筒型基础运输至第一区域处,并利用大型浮吊将筒型基础吊装下水,之后将筒型基础拖带至第二区域,在第二区域处对筒型基础下沉安装,该安装方法能够适用于水深较浅处的筒型基础的安装。
Mounting method of barrel-type foundation
The invention relates to the technical field of offshore wind power operation, in particular to a mounting method of a barrel-type foundation. The mounting method comprises the steps that the barrel-type foundation is hoisted into water in a first area; the barrel-type foundation is drawn to a second area, wherein the water depth of the second area is smaller than that of the first area; and the barrel-type foundation is sunken to be mounted in the second area. Due to the fact that the water depth of the first area is large, the barrel-type foundation can be transported to the first area through a large barge, the barrel-type foundation is hoisted into water through a large floating crane, then the barrel-type foundation is drawn to the second area, and the barrel-type foundation is sunkento be mounted in the second area. The mounting method can be suitable for mounting of the barrel-type foundation in the place with the small water depth.
本发明涉及海上风电作业技术领域,具体涉及一种筒型基础安装方法,包括:在第一区域处将筒型基础吊装下水;将所述筒型基础拖带至第二区域,其中所述第二区域的水深小于所述第一区域的水深;在所述第二区域处,使所述筒型基础下沉安装。由于第一区域的水深较大,能够利用大型驳船将筒型基础运输至第一区域处,并利用大型浮吊将筒型基础吊装下水,之后将筒型基础拖带至第二区域,在第二区域处对筒型基础下沉安装,该安装方法能够适用于水深较浅处的筒型基础的安装。
Mounting method of barrel-type foundation
一种筒型基础安装方法
ZHANG JIANXIANG (author) / YUAN XINYONG (author) / ZHANG QINGTAO (author) / WANG HUAIMING (author) / HE GUANGLING (author) / CHEN JIANZHENG (author) / WANG ZONGYAO (author) / CUI WENTAO (author) / MIN QIAOLING (author) / KONG DEHUANG (author)
2020-10-13
Patent
Electronic Resource
Chinese
Pile and barrel combined type offshore wind turbine foundation and mounting method thereof
European Patent Office | 2023
|Barrel-shaped foundation structure for ocean engineering and mounting method
European Patent Office | 2020
|Floating suction barrel foundation construction method and floating suction barrel foundation
European Patent Office | 2021
|European Patent Office | 2024
|