Aluminum veneer suspended ceiling construction process
The invention relates to an aluminum veneer suspended ceiling construction process which comprises the following steps of S1, carrying out ground lofting on a part needing a to-be-modeled structure onthe ground, and conducting projecting to a ceiling after ground lofting is carried out so as to obtain a lofting mark; S2, according to the lofting mark, building a base layer model of the to-be-modeled structure by adopting a light steel keel bracket, a calcium silicate board base layer and a flame-retardant board base layer; S3, performing three-dimensional scanning modeling on the base layer model, and processing a three-dimensional modeling graph to obtain an aluminum veneer matched with the modeling structure; and S4, seamlessly and closely splicing the processed aluminum veneers, and adhering the spliced aluminum veneers to the base layer model by adopting a structural adhesive so as to obtain a modeling structure. The aluminum veneer suspended ceiling construction process has the advantages that by improving a traditional construction process, the dead weight of a decoration object is reduced, the sealing and splicing effect of an aluminum veneer suspended ceiling arc-shaped diffuse reflection lamp groove and a hyperboloid-shaped suspended ceiling meeting the design requirement is achieved, the construction process is simplified, and the construction efficiency is improved.
本发明涉及一种铝单板吊顶施工工艺,包括以下步骤:步骤S1、将需要待造型结构的部位在地面进行地面放样,地面放样后投影到天棚上,从而获得放样标记;步骤S2、根据放样标记,采用轻钢龙骨支架、硅钙板基层、阻燃板基层对待造型结构建立基层模型;步骤S3、基层模型进行三维扫描建模,再把三维建模图形加工,获得与造型结构相匹配的铝单板;步骤S4、对加工好的铝单板进行无缝密拼,拼接好后与基层模型采用结构胶粘贴,从而获得造型结构。其优点表现在:通过改进传统施工工艺,减少了装饰物的自重,满足了设计要求的铝单板吊顶弧形漫反射灯槽和双曲面造型吊顶密封拼接的效果,简化了施工工艺,提高了施工效率。
Aluminum veneer suspended ceiling construction process
The invention relates to an aluminum veneer suspended ceiling construction process which comprises the following steps of S1, carrying out ground lofting on a part needing a to-be-modeled structure onthe ground, and conducting projecting to a ceiling after ground lofting is carried out so as to obtain a lofting mark; S2, according to the lofting mark, building a base layer model of the to-be-modeled structure by adopting a light steel keel bracket, a calcium silicate board base layer and a flame-retardant board base layer; S3, performing three-dimensional scanning modeling on the base layer model, and processing a three-dimensional modeling graph to obtain an aluminum veneer matched with the modeling structure; and S4, seamlessly and closely splicing the processed aluminum veneers, and adhering the spliced aluminum veneers to the base layer model by adopting a structural adhesive so as to obtain a modeling structure. The aluminum veneer suspended ceiling construction process has the advantages that by improving a traditional construction process, the dead weight of a decoration object is reduced, the sealing and splicing effect of an aluminum veneer suspended ceiling arc-shaped diffuse reflection lamp groove and a hyperboloid-shaped suspended ceiling meeting the design requirement is achieved, the construction process is simplified, and the construction efficiency is improved.
本发明涉及一种铝单板吊顶施工工艺,包括以下步骤:步骤S1、将需要待造型结构的部位在地面进行地面放样,地面放样后投影到天棚上,从而获得放样标记;步骤S2、根据放样标记,采用轻钢龙骨支架、硅钙板基层、阻燃板基层对待造型结构建立基层模型;步骤S3、基层模型进行三维扫描建模,再把三维建模图形加工,获得与造型结构相匹配的铝单板;步骤S4、对加工好的铝单板进行无缝密拼,拼接好后与基层模型采用结构胶粘贴,从而获得造型结构。其优点表现在:通过改进传统施工工艺,减少了装饰物的自重,满足了设计要求的铝单板吊顶弧形漫反射灯槽和双曲面造型吊顶密封拼接的效果,简化了施工工艺,提高了施工效率。
Aluminum veneer suspended ceiling construction process
一种铝单板吊顶施工工艺
CHEN PENG (author) / WAN XUDONG (author) / ZHOU BANGRONG (author) / YU TAO (author) / LI SHIDE (author) / LAN YUNPU (author)
2020-10-13
Patent
Electronic Resource
Chinese