A platform for research: civil engineering, architecture and urbanism
Block combination structure of fabricated open trench tunnel
The invention discloses a block combination structure of a fabricated open trench tunnel. The block combination structure of the fabricated open trench tunnel at least comprises a cast-in-place bottomplate, a prefabricated top plate, a prefabricated left side wall, a prefabricated middle partition wall and a prefabricated right side wall. The cast-in-place bottom plate is adopted, the number of joints is effectively reduced, and the block combination structure is beneficial to waterproofing; and an arched inverted-T-beam is adopted in the top plate to optimize the structural stress, the platethickness is effectively reduced, the lifting weight of a block is reduced, and the block combination structure of the fabricated open trench tunnel meets rapid construction requirements in a city. The horizontal force is mainly borne by a first underground wall and a second underground wall, and the prefabricated left side wall, the prefabricated right side wall and the prefabricated middle partition wall mainly bear the vertical axial force.
本发明公开了一种装配式明挖隧道的分块组合结构,至少包括现浇底板、预制顶板、预制左侧墙、预制中隔墙和预制右侧墙。本发明采用现浇底板可有效减少接缝数量,利于防水;顶板采用起拱倒T梁可优化结构受力,有效减少板厚,从而减小分块的吊装重量,适应于城市内快速施工建设的需求;水平力主要由第一地下墙和第二地下墙承担,预制左侧墙、预制右侧墙及预制中隔墙以承担竖向轴力为主。
Block combination structure of fabricated open trench tunnel
The invention discloses a block combination structure of a fabricated open trench tunnel. The block combination structure of the fabricated open trench tunnel at least comprises a cast-in-place bottomplate, a prefabricated top plate, a prefabricated left side wall, a prefabricated middle partition wall and a prefabricated right side wall. The cast-in-place bottom plate is adopted, the number of joints is effectively reduced, and the block combination structure is beneficial to waterproofing; and an arched inverted-T-beam is adopted in the top plate to optimize the structural stress, the platethickness is effectively reduced, the lifting weight of a block is reduced, and the block combination structure of the fabricated open trench tunnel meets rapid construction requirements in a city. The horizontal force is mainly borne by a first underground wall and a second underground wall, and the prefabricated left side wall, the prefabricated right side wall and the prefabricated middle partition wall mainly bear the vertical axial force.
本发明公开了一种装配式明挖隧道的分块组合结构,至少包括现浇底板、预制顶板、预制左侧墙、预制中隔墙和预制右侧墙。本发明采用现浇底板可有效减少接缝数量,利于防水;顶板采用起拱倒T梁可优化结构受力,有效减少板厚,从而减小分块的吊装重量,适应于城市内快速施工建设的需求;水平力主要由第一地下墙和第二地下墙承担,预制左侧墙、预制右侧墙及预制中隔墙以承担竖向轴力为主。
Block combination structure of fabricated open trench tunnel
装配式明挖隧道的分块组合结构
OUYANG WENBIAO (author) / HONG ZIXUAN (author) / ZHANG YINPING (author) / JIANG HONG (author)
2020-10-20
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Information system for open trench tunnel lining construction
European Patent Office | 2020
|European Patent Office | 2023
|Air bag type sealing structure for deformation joint of open trench tunnel
European Patent Office | 2015
|Construction method for upcrossing existing electric power tunnel on open trench tunnel
European Patent Office | 2020
|Fabricated tunnel structure suitable for open cut tunnel and construction method thereof
European Patent Office | 2023
|