A platform for research: civil engineering, architecture and urbanism
Suspending, correcting and fixing formwork method for concrete shear wall large steel formwork
Provided is a suspending, correcting and fixing formwork method for a concrete shear wall large steel formwork. When poured wall concrete on a current construction floor is just finished, wall positioning prefabricated blocks A are disposed on the upper surface of the poured wall concrete; when poured beam concrete on the current construction floor is just finished, beam positioning prefabricatedblocks B are disposed on the upper surface of the poured beam concrete; when the strength of the dried wall concrete and the dried beam concrete on the current construction floor reaches a preset value, a large steel formwork and a beam formwork are detached, and a parting agent is sprayed; the large steel formwork is lifted to a second construction floor; and the axis is determined by the wall positioning prefabricated blocks A, and the large steel formwork and a beam formwork on the second construction floor are assembled. By means of the method, a wall formwork can be constructed after a top plate formwork is constructed, and wall concrete can be poured after top plate concrete is poured, so that continuity of woodworking and concrete work is ensured, economic benefits of enterprises are improved, a construction cycle is shortened, and project quality is improved.
一种混凝土剪力墙大型钢模板悬空校正固定支模法,在当前施工楼层浇筑墙体混凝土刚完成时,在所述浇筑墙体混凝土的上表面安设有墙体定位预制块A;在当前施工楼层浇筑梁混凝土刚完成时,在所述浇筑梁混凝土的上表面安设梁定位预制块B,待当前施工楼层的墙体混凝土及梁混凝的干燥后的强度达到预设值时,拆开大型钢模板及梁模板,喷刷隔离剂;将大型钢模板提升到第二施工楼层位置;通过所述墙体定位预制块A确定轴线位置,安装第二施工楼层大型钢模板及梁模板;本发明在顶板模板施工完成后即可施工墙体模板,可实现顶板混凝土浇筑完成后即可浇筑墙体混凝土,保证了木工及混凝土工施工的连续性,提高企业的经济效益,缩短施工周期,提高工程质量。
Suspending, correcting and fixing formwork method for concrete shear wall large steel formwork
Provided is a suspending, correcting and fixing formwork method for a concrete shear wall large steel formwork. When poured wall concrete on a current construction floor is just finished, wall positioning prefabricated blocks A are disposed on the upper surface of the poured wall concrete; when poured beam concrete on the current construction floor is just finished, beam positioning prefabricatedblocks B are disposed on the upper surface of the poured beam concrete; when the strength of the dried wall concrete and the dried beam concrete on the current construction floor reaches a preset value, a large steel formwork and a beam formwork are detached, and a parting agent is sprayed; the large steel formwork is lifted to a second construction floor; and the axis is determined by the wall positioning prefabricated blocks A, and the large steel formwork and a beam formwork on the second construction floor are assembled. By means of the method, a wall formwork can be constructed after a top plate formwork is constructed, and wall concrete can be poured after top plate concrete is poured, so that continuity of woodworking and concrete work is ensured, economic benefits of enterprises are improved, a construction cycle is shortened, and project quality is improved.
一种混凝土剪力墙大型钢模板悬空校正固定支模法,在当前施工楼层浇筑墙体混凝土刚完成时,在所述浇筑墙体混凝土的上表面安设有墙体定位预制块A;在当前施工楼层浇筑梁混凝土刚完成时,在所述浇筑梁混凝土的上表面安设梁定位预制块B,待当前施工楼层的墙体混凝土及梁混凝的干燥后的强度达到预设值时,拆开大型钢模板及梁模板,喷刷隔离剂;将大型钢模板提升到第二施工楼层位置;通过所述墙体定位预制块A确定轴线位置,安装第二施工楼层大型钢模板及梁模板;本发明在顶板模板施工完成后即可施工墙体模板,可实现顶板混凝土浇筑完成后即可浇筑墙体混凝土,保证了木工及混凝土工施工的连续性,提高企业的经济效益,缩短施工周期,提高工程质量。
Suspending, correcting and fixing formwork method for concrete shear wall large steel formwork
一种混凝土剪力墙大型钢模板悬空校正固定支模法
HUI YUQING (author)
2020-10-23
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|FORMWORK FIXING MEMBER AND FORMWORK FIXING BRACKET FOR CONCRETE RETAINING WALL
European Patent Office | 2020
|