Concrete pouring method for steel-concrete composite beam bridge deck slab
The invention discloses a concrete pouring method for a steel-concrete composite beam bridge deck slab. The concrete pouring method comprises the following steps of constructing a lower structure of awhole bridge; carrying out welding detection on a steel box girder; binding reinforcing steel bars at the top of the steel box girder; detaching a side die, and temporarily locking a contact support;removing a bottom die and the construction support; hoisting outriggers, transversely connecting and splicing on site, mounting a bridge floor bottom steel plate, and longitudinally connecting a connecting piece on the bottom steel plate; and binding bridge deck slab reinforcing steel bars, and pouring bridge deck slab hybrid fiber concrete. The method has the advantages that construction qualityof the steel-concrete composite beam bridge deck slab is remarkably improved, a construction speed of the steel-concrete composite beam bridge deck slab is remarkably increased, the constructed bridge deck slab has extremely high strength, and a service life is remarkably prolonged.
本发明公开了一种钢混组合梁桥面板混凝土浇筑方法,包括以下步骤:对全桥下部结构进行施工;对钢箱梁进行焊接检测;在钢箱梁顶部绑扎钢筋;拆除侧模,接触支座临时锁定;拆除底模以及施工支架;吊装挑梁、横联并进行现场拼接,安装桥面底钢板,底钢板上连接件纵向连接;绑扎桥面板钢筋,浇筑桥面板混杂纤维混凝土。达到的技术效果为:显著提高了钢混组合梁桥面板的施工质量,显著提高了钢混组合梁桥面板的施工的速度,施工后的桥面板具有极高的强度,使用寿命显著增强。
Concrete pouring method for steel-concrete composite beam bridge deck slab
The invention discloses a concrete pouring method for a steel-concrete composite beam bridge deck slab. The concrete pouring method comprises the following steps of constructing a lower structure of awhole bridge; carrying out welding detection on a steel box girder; binding reinforcing steel bars at the top of the steel box girder; detaching a side die, and temporarily locking a contact support;removing a bottom die and the construction support; hoisting outriggers, transversely connecting and splicing on site, mounting a bridge floor bottom steel plate, and longitudinally connecting a connecting piece on the bottom steel plate; and binding bridge deck slab reinforcing steel bars, and pouring bridge deck slab hybrid fiber concrete. The method has the advantages that construction qualityof the steel-concrete composite beam bridge deck slab is remarkably improved, a construction speed of the steel-concrete composite beam bridge deck slab is remarkably increased, the constructed bridge deck slab has extremely high strength, and a service life is remarkably prolonged.
本发明公开了一种钢混组合梁桥面板混凝土浇筑方法,包括以下步骤:对全桥下部结构进行施工;对钢箱梁进行焊接检测;在钢箱梁顶部绑扎钢筋;拆除侧模,接触支座临时锁定;拆除底模以及施工支架;吊装挑梁、横联并进行现场拼接,安装桥面底钢板,底钢板上连接件纵向连接;绑扎桥面板钢筋,浇筑桥面板混杂纤维混凝土。达到的技术效果为:显著提高了钢混组合梁桥面板的施工质量,显著提高了钢混组合梁桥面板的施工的速度,施工后的桥面板具有极高的强度,使用寿命显著增强。
Concrete pouring method for steel-concrete composite beam bridge deck slab
一种钢混组合梁桥面板混凝土浇筑方法
YANG YUPING (author) / DU XIANWU (author) / LI DENG (author) / REN XIAOGUANG (author) / LI XIAOLEI (author) / JIAO PENGLE (author) / WANG JIE (author) / LI YONGTAO (author) / JU HAITONG (author) / CHEN XUEBIN (author)
2020-10-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Steel-concrete composite beam bridge deck slab pouring construction tool and construction method
European Patent Office | 2021
|European Patent Office | 2021
|Steel-concrete composite beam bridge deck slab supporting mechanism
European Patent Office | 2021
|Pouring device and method for steel shell-concrete composite orthotropic bridge deck slab structure
European Patent Office | 2024
|Construction method of steel-concrete composite beam bridge deck slab
European Patent Office | 2020
|