A platform for research: civil engineering, architecture and urbanism
Reverse hanging partition wall of super high-rise building and construction method thereof
The invention discloses a reverse hanging partition wall of a super high-rise building and a construction method thereof, and relates to the technical field of reverse hanging partition walls of superhigh-rise buildings. The reverse hanging partition wall of the super high-rise building comprises a bottom groove plate and sliding grooves, wherein position adjusting mechanisms are arranged on theleft side and the right side inside the bottom groove plate, limiting clamping mechanisms are mounted above the bottom groove plate, a ridge plate keel is mounted above the limiting clamping mechanisms, a connecting double-end head threaded rod penetrates through the middle of the ridge plate keel, and fixing nuts are connected to the front end and the rear end of the connecting double-end threaded rod. The reverse hanging partition wall of the super high-rise building is provided with the position adjusting mechanisms, each hand wheel rod pushes each wheel frame to move in the vertical centerline direction of each column frame until each roller is pushed out of the inside of each column frame, the bottom groove plate is adjusted to a proper height, the rollers can provide auxiliary movement for the reserve hanging partition wall, the moving flexibility of the reserve hanging partition wall can be effectively improved, and the reserve hanging partition wall can be adjusted to a properposition.
本发明公开了一种超高层建筑反吊隔墙及其施工方法,涉及超高层建筑反吊隔墙技术领域,具体为一种超高层建筑反吊隔墙,包括底槽板和滑槽,所述底槽板内部的左右两侧均设置有位置调节机构,所述底槽板的上方安装有限位夹持机构,且限位夹持机构的上方安装有脊板龙骨,所述脊板龙骨的中部贯穿有连接双端头螺纹杆,且连接双端头螺纹杆的前后两端均连接有固定螺帽。该超高层建筑反吊隔墙设置有位置调节机构,手轮杆推动轮架沿柱架的竖直中心线方向移动,直至将滚轮推送出柱架的内部,将底槽板调节至合适的高度,滚轮能够为反吊隔墙提供辅助移动,能够有效的提高反吊隔墙移动的灵活性,可将反吊隔墙调节至合适的位置。
Reverse hanging partition wall of super high-rise building and construction method thereof
The invention discloses a reverse hanging partition wall of a super high-rise building and a construction method thereof, and relates to the technical field of reverse hanging partition walls of superhigh-rise buildings. The reverse hanging partition wall of the super high-rise building comprises a bottom groove plate and sliding grooves, wherein position adjusting mechanisms are arranged on theleft side and the right side inside the bottom groove plate, limiting clamping mechanisms are mounted above the bottom groove plate, a ridge plate keel is mounted above the limiting clamping mechanisms, a connecting double-end head threaded rod penetrates through the middle of the ridge plate keel, and fixing nuts are connected to the front end and the rear end of the connecting double-end threaded rod. The reverse hanging partition wall of the super high-rise building is provided with the position adjusting mechanisms, each hand wheel rod pushes each wheel frame to move in the vertical centerline direction of each column frame until each roller is pushed out of the inside of each column frame, the bottom groove plate is adjusted to a proper height, the rollers can provide auxiliary movement for the reserve hanging partition wall, the moving flexibility of the reserve hanging partition wall can be effectively improved, and the reserve hanging partition wall can be adjusted to a properposition.
本发明公开了一种超高层建筑反吊隔墙及其施工方法,涉及超高层建筑反吊隔墙技术领域,具体为一种超高层建筑反吊隔墙,包括底槽板和滑槽,所述底槽板内部的左右两侧均设置有位置调节机构,所述底槽板的上方安装有限位夹持机构,且限位夹持机构的上方安装有脊板龙骨,所述脊板龙骨的中部贯穿有连接双端头螺纹杆,且连接双端头螺纹杆的前后两端均连接有固定螺帽。该超高层建筑反吊隔墙设置有位置调节机构,手轮杆推动轮架沿柱架的竖直中心线方向移动,直至将滚轮推送出柱架的内部,将底槽板调节至合适的高度,滚轮能够为反吊隔墙提供辅助移动,能够有效的提高反吊隔墙移动的灵活性,可将反吊隔墙调节至合适的位置。
Reverse hanging partition wall of super high-rise building and construction method thereof
一种超高层建筑反吊隔墙及其施工方法
LI HAITAO (author) / CUI JUNLEI (author) / LI HONGBING (author) / GUO SHAOHUA (author) / ZHANG LEI (author)
2020-10-27
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Hanging safety construction platform for high-rise building outer wall construction
European Patent Office | 2024
|Super-high-rise cylindrical building full-reverse construction method
European Patent Office | 2015
|Hanging frame system for super high-rise core tube inclined wall construction
European Patent Office | 2024
|Outer wall masonry safety protection hanging basket for high-rise building construction
European Patent Office | 2024
|European Patent Office | 2023
|