A platform for research: civil engineering, architecture and urbanism
Curtain wall dry-hung stone fixing and assembling keel frame
The invention relates to a curtain wall dry-hung stone fixing and assembling keel frame. The curtain wall dry-hung stone fixing and assembling keel frame comprises a mounting seat, connecting plates,clamping devices and locking devices. The connecting plates are evenly mounted at the front end of the mounting seat, the clamping devices are arranged at the front ends of the connecting plates in aleft-and-right symmetry manner, the clamping devices are mounted on the connecting plates, and the locking devices are arranged on the rear sides of the clamping devices. The problems that when a curtain wall is mounted through an existing keel frame, the curtain wall cannot be clamped and self-locked when mounted, the curtain wall shakes when fixed, thus, the stability of the curtain wall is reduced, manual mounting and fixing are not facilitated, manpower and material resources are increased, meanwhile, the joint cannot be filled and clamped when the curtain wall and the keel frame are fixed, and therefore the stability after the curtain wall is mounted is reduced; and the keel frame is integrated and cannot be spliced, thus, the curtain wall cannot be mounted on walls with different areas, and the applicability of the keel frame is reduced can be solved.
本发明涉及一种幕墙干挂石材固定组装龙骨架,包括安装座、连接板、夹持装置和锁紧装置,所述的安装座前端均匀安装有连接板,连接板前端左右对称设置有夹持装置,夹持装置安装在连接板上,夹持装置后侧设置有锁紧装置。本发明可以解决现有的龙骨架对幕墙进行安装时,不能在幕墙安装时对幕墙进行夹紧自锁,幕墙在固定时易出现晃动的现象,从而降低了幕墙的稳定性,不利于人工的安装固定,增加了人力物力,同时,不能在幕墙与龙骨架固定时对连接处进行填充卡紧,从而降低了幕墙安装后的稳定性,并且,龙骨架为一体,不能进行拼接,从而不能对不同面积的墙面进行安装,降低了龙骨架的适用性等问题。
Curtain wall dry-hung stone fixing and assembling keel frame
The invention relates to a curtain wall dry-hung stone fixing and assembling keel frame. The curtain wall dry-hung stone fixing and assembling keel frame comprises a mounting seat, connecting plates,clamping devices and locking devices. The connecting plates are evenly mounted at the front end of the mounting seat, the clamping devices are arranged at the front ends of the connecting plates in aleft-and-right symmetry manner, the clamping devices are mounted on the connecting plates, and the locking devices are arranged on the rear sides of the clamping devices. The problems that when a curtain wall is mounted through an existing keel frame, the curtain wall cannot be clamped and self-locked when mounted, the curtain wall shakes when fixed, thus, the stability of the curtain wall is reduced, manual mounting and fixing are not facilitated, manpower and material resources are increased, meanwhile, the joint cannot be filled and clamped when the curtain wall and the keel frame are fixed, and therefore the stability after the curtain wall is mounted is reduced; and the keel frame is integrated and cannot be spliced, thus, the curtain wall cannot be mounted on walls with different areas, and the applicability of the keel frame is reduced can be solved.
本发明涉及一种幕墙干挂石材固定组装龙骨架,包括安装座、连接板、夹持装置和锁紧装置,所述的安装座前端均匀安装有连接板,连接板前端左右对称设置有夹持装置,夹持装置安装在连接板上,夹持装置后侧设置有锁紧装置。本发明可以解决现有的龙骨架对幕墙进行安装时,不能在幕墙安装时对幕墙进行夹紧自锁,幕墙在固定时易出现晃动的现象,从而降低了幕墙的稳定性,不利于人工的安装固定,增加了人力物力,同时,不能在幕墙与龙骨架固定时对连接处进行填充卡紧,从而降低了幕墙安装后的稳定性,并且,龙骨架为一体,不能进行拼接,从而不能对不同面积的墙面进行安装,降低了龙骨架的适用性等问题。
Curtain wall dry-hung stone fixing and assembling keel frame
一种幕墙干挂石材固定组装龙骨架
ZHAO HUINAN (author) / CUI JIANZHANG (author)
2020-10-27
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Keel steel frame for fixing in dry-hanging installation of curtain wall stone
European Patent Office | 2020
|European Patent Office | 2020
|