A platform for research: civil engineering, architecture and urbanism
Piling device for building constructional engineering foundation
The invention discloses a piling device for building a constructional engineering foundation. The piling device comprises a shell and a frame. An operation door is hinged to the front face of the shell, a hammer opening is formed in the bottom end of the shell, and racks are fixedly arranged on the inner walls of the two sides of the shell correspondingly. The two racks are in engaged connection with two limiting mechanisms correspondingly, and the bottom ends of the two limiting mechanisms are fixedly connected with the two sides of the top end of a horizontal plate correspondingly. A liftinglug is fixedly arranged in the middle of the top end of the horizontal plate, and a pile hammer is fixedly arranged in the middle of the bottom end of the horizontal plate. The piling device for building the constructional engineering foundation has the beneficial effects that the bottom ends of four guide sleeves are fixedly connected with the two sides of the top ends of noise reduction mechanisms correspondingly, the noise reduction mechanisms can compress springs when impacted, damage is not prone to happening; and in the piling process, sound insulation plates and sound absorption cottonof the noise reduction mechanisms can reduce noise generated by piling, noise pollution is reduced, the shell can block raised dust generated by piling, and the construction environment can be protected.
本发明公开了一种建筑工程地基搭建用打桩装置,包括外壳和框架,外壳的正面铰接有操作门,外壳的底端开设有锤口,外壳两侧的内壁均固定设有齿条,两个齿条分别与两个限位机构啮合连接,两个限位机构的底端分别与水平板顶端的两侧固定连接,水平板顶端的中部固定设有吊耳,水平板底端的中部固定设有桩锤;本发明的有益效果是:本发明一种建筑工程地基搭建用打桩装置,通过将四个导套的底端分别与降噪机构顶端的两侧固定连接,降噪机构受到冲击会压缩弹簧,不易破损,在打桩的过程中,降噪机构的隔音板和吸音棉能够减少打桩产生的噪音,减少了噪声污染,外壳能够阻挡打桩产生的扬尘,可对施工环境进行保护。
Piling device for building constructional engineering foundation
The invention discloses a piling device for building a constructional engineering foundation. The piling device comprises a shell and a frame. An operation door is hinged to the front face of the shell, a hammer opening is formed in the bottom end of the shell, and racks are fixedly arranged on the inner walls of the two sides of the shell correspondingly. The two racks are in engaged connection with two limiting mechanisms correspondingly, and the bottom ends of the two limiting mechanisms are fixedly connected with the two sides of the top end of a horizontal plate correspondingly. A liftinglug is fixedly arranged in the middle of the top end of the horizontal plate, and a pile hammer is fixedly arranged in the middle of the bottom end of the horizontal plate. The piling device for building the constructional engineering foundation has the beneficial effects that the bottom ends of four guide sleeves are fixedly connected with the two sides of the top ends of noise reduction mechanisms correspondingly, the noise reduction mechanisms can compress springs when impacted, damage is not prone to happening; and in the piling process, sound insulation plates and sound absorption cottonof the noise reduction mechanisms can reduce noise generated by piling, noise pollution is reduced, the shell can block raised dust generated by piling, and the construction environment can be protected.
本发明公开了一种建筑工程地基搭建用打桩装置,包括外壳和框架,外壳的正面铰接有操作门,外壳的底端开设有锤口,外壳两侧的内壁均固定设有齿条,两个齿条分别与两个限位机构啮合连接,两个限位机构的底端分别与水平板顶端的两侧固定连接,水平板顶端的中部固定设有吊耳,水平板底端的中部固定设有桩锤;本发明的有益效果是:本发明一种建筑工程地基搭建用打桩装置,通过将四个导套的底端分别与降噪机构顶端的两侧固定连接,降噪机构受到冲击会压缩弹簧,不易破损,在打桩的过程中,降噪机构的隔音板和吸音棉能够减少打桩产生的噪音,减少了噪声污染,外壳能够阻挡打桩产生的扬尘,可对施工环境进行保护。
Piling device for building constructional engineering foundation
一种建筑工程地基搭建用打桩装置
CAI HUACHENG (author) / WANG HAI (author)
2020-10-30
Patent
Electronic Resource
Chinese
Piling system for constructional engineering foundation construction
European Patent Office | 2021
|Piling device for constructional engineering and piling method thereof
European Patent Office | 2021
|