A platform for research: civil engineering, architecture and urbanism
Construction method of positioning and installing keel frame of building curtain wall
The invention relates to a construction method of positioning and installing a keel frame of a building curtain wall. A construction device of positioning and installing the keel frame of the buildingcurtain wall is used in the method. The construction device comprises a clamping mechanism and an installation mechanism. The installation mechanism is arranged at the upper end of the clamping mechanism in a sliding fit mode. The installation mechanism is arranged symmetrically on the left and right sides in structure. According to the construction method of positioning and installing the keel frame of the building curtain wall, the design concept of horizontal and vertical integrated installation structure is adopted for positioning and installing the keel frame of the building curtain wall. The installation mechanism arranged can realize continuous installation of horizontal and vertical keels and can limit the position in the keel installation, so that the phenomenon of improper connection between the keels can be avoided. At the same time, a plurality of other structures which have limiting and guiding functions are arranged to ensure the overall symmetry of the keel frame installation.
本发明涉及一种建筑幕墙龙骨架定位安装施工方法,其使用了一种建筑幕墙龙骨架定位安装施工装置,该建筑幕墙龙骨架定位安装施工装置包括夹固机构和安装机构,所述的夹固机构的上端通过滑动配合方式设置有安装机构,安装机构呈左右对称排布结构,本发明采用横、竖一体安装结构的设计理念进行建筑幕墙龙骨架定位安装,设置的安装机构可实现横向和竖向龙骨的连续安装,且可对龙骨的安装起到限位的作用,以避免龙骨之间出现对接不正的现象,同时还是设置有多个其他具有限位与导向作用的结构以保证龙骨架安装的整体对称性。
Construction method of positioning and installing keel frame of building curtain wall
The invention relates to a construction method of positioning and installing a keel frame of a building curtain wall. A construction device of positioning and installing the keel frame of the buildingcurtain wall is used in the method. The construction device comprises a clamping mechanism and an installation mechanism. The installation mechanism is arranged at the upper end of the clamping mechanism in a sliding fit mode. The installation mechanism is arranged symmetrically on the left and right sides in structure. According to the construction method of positioning and installing the keel frame of the building curtain wall, the design concept of horizontal and vertical integrated installation structure is adopted for positioning and installing the keel frame of the building curtain wall. The installation mechanism arranged can realize continuous installation of horizontal and vertical keels and can limit the position in the keel installation, so that the phenomenon of improper connection between the keels can be avoided. At the same time, a plurality of other structures which have limiting and guiding functions are arranged to ensure the overall symmetry of the keel frame installation.
本发明涉及一种建筑幕墙龙骨架定位安装施工方法,其使用了一种建筑幕墙龙骨架定位安装施工装置,该建筑幕墙龙骨架定位安装施工装置包括夹固机构和安装机构,所述的夹固机构的上端通过滑动配合方式设置有安装机构,安装机构呈左右对称排布结构,本发明采用横、竖一体安装结构的设计理念进行建筑幕墙龙骨架定位安装,设置的安装机构可实现横向和竖向龙骨的连续安装,且可对龙骨的安装起到限位的作用,以避免龙骨之间出现对接不正的现象,同时还是设置有多个其他具有限位与导向作用的结构以保证龙骨架安装的整体对称性。
Construction method of positioning and installing keel frame of building curtain wall
一种建筑幕墙龙骨架定位安装施工方法
CHU XIAOYAN (author)
2020-10-30
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Building curtain wall keel frame installation construction method
European Patent Office | 2021
|Device and method for quickly positioning and installing transverse keel of building curtain wall
European Patent Office | 2023
|Building curtain wall hanging keel frame and installation method
European Patent Office | 2024
|