A platform for research: civil engineering, architecture and urbanism
All-round scaffold convenient for ground construction
The invention discloses an all-round scaffold convenient for ground construction, and relates to the field of building scaffolds. The all-round scaffold comprises a plurality of X-axis steel pipes, aplurality of Y-axis steel pipes and a plurality of Z-axis steel pipes which are distributed in a matrix, all the X-axis steel pipes, the Y-axis steel pipes and the Z-axis steel pipes form a pluralityof connecting points distributed in a matrix mode, each connecting point is provided with one X-axis steel pipe, one Y-axis steel pipe and one Z-axis steel pipe which are connected, each Z-axis steelpipe comprises a first part, a second part and a connecting mechanism, steel pipe fasteners are arranged at the upper end and the lower end of each connecting mechanism, and the lower end of the firstpart and the upper end of the second part are correspondingly and fixedly connected with the connecting mechanisms through one steel pipe fastener. During use, the second part of the lower part of the Z-axis steel pipe is disassembled in rows or columns, so that ground construction can be performed without waiting for top and wall surface construction, the construction period is greatly shortened, and the construction period requirement is met.
本发明公开了一种便于地面施工的满堂脚手架,涉及建筑脚手架领域,包括若干个X轴钢管、若干个Y轴钢管和若干个Z轴钢管,若干个X轴钢管、若干个Y轴钢管和若干个Z轴钢管均呈矩阵分布,所有X轴钢管、Y轴钢管和Z轴钢管形成若干个呈矩阵分布的连接点,每个连接点处均有一个X轴钢管、一个Y轴钢管和一个Z轴钢管连接,每个Z轴钢管均包括第一部分、第二部分和连接机构,连接机构的上下两端均设有钢管扣件,所述第一部分的下端和第二部分的上端分别通过一个钢管扣件与连接机构固定连接。本发明在使用时,按排或者列将Z轴钢管下部的第二部分拆卸,从而能够不需要再等顶部和墙面施工完成,进行地面施工,大幅度缩短了工期,以达到工期要求。
All-round scaffold convenient for ground construction
The invention discloses an all-round scaffold convenient for ground construction, and relates to the field of building scaffolds. The all-round scaffold comprises a plurality of X-axis steel pipes, aplurality of Y-axis steel pipes and a plurality of Z-axis steel pipes which are distributed in a matrix, all the X-axis steel pipes, the Y-axis steel pipes and the Z-axis steel pipes form a pluralityof connecting points distributed in a matrix mode, each connecting point is provided with one X-axis steel pipe, one Y-axis steel pipe and one Z-axis steel pipe which are connected, each Z-axis steelpipe comprises a first part, a second part and a connecting mechanism, steel pipe fasteners are arranged at the upper end and the lower end of each connecting mechanism, and the lower end of the firstpart and the upper end of the second part are correspondingly and fixedly connected with the connecting mechanisms through one steel pipe fastener. During use, the second part of the lower part of the Z-axis steel pipe is disassembled in rows or columns, so that ground construction can be performed without waiting for top and wall surface construction, the construction period is greatly shortened, and the construction period requirement is met.
本发明公开了一种便于地面施工的满堂脚手架,涉及建筑脚手架领域,包括若干个X轴钢管、若干个Y轴钢管和若干个Z轴钢管,若干个X轴钢管、若干个Y轴钢管和若干个Z轴钢管均呈矩阵分布,所有X轴钢管、Y轴钢管和Z轴钢管形成若干个呈矩阵分布的连接点,每个连接点处均有一个X轴钢管、一个Y轴钢管和一个Z轴钢管连接,每个Z轴钢管均包括第一部分、第二部分和连接机构,连接机构的上下两端均设有钢管扣件,所述第一部分的下端和第二部分的上端分别通过一个钢管扣件与连接机构固定连接。本发明在使用时,按排或者列将Z轴钢管下部的第二部分拆卸,从而能够不需要再等顶部和墙面施工完成,进行地面施工,大幅度缩短了工期,以达到工期要求。
All-round scaffold convenient for ground construction
一种便于地面施工的满堂脚手架
JIANG ZHENBIN (author) / WU XIUXIU (author) / TENG BAIXING (author)
2020-10-30
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2021
|Construction-based scaffold convenient to assemble and disassemble
European Patent Office | 2021
|Building construction scaffold convenient to mount and dismount
European Patent Office | 2022
|Building construction scaffold convenient and fast to adjust
European Patent Office | 2024
|Engineering construction scaffold convenient to adjust in height
European Patent Office | 2021
|