Lintel-free non-grooving distribution box concrete encapsulating construction process
The invention discloses a lintel-free non-grooving distribution box concrete encapsulating construction process. The process comprises the following steps that 1, concrete encapsulating dimensions aredetermined based on dimensions of a wall and modulus; 2, formwork erecting is conducted and reinforcement is realized; 3, after erecting is completed, fine stone concrete at the same level as a construction column is cast, and concrete vibration is conducted in the process of casting; and 4, form stripping is conducted after casting and maintenance. By using concrete to encapsulate a distributionbox, the distribution box becomes a stress component which can bear vertical stresses, and lintel prefabrication and installation can be canceled; by determining the encapsulating thickness based onthe dimensions of the wall and the modulus, the wall becomes building blocks that can be built by bricklaying; and a traditional plastering bricklaying method can be adopted for construction and secondary grooving is omitted.
本发明公开了一种免过梁免开槽配电箱混凝土包封施工工艺,该工艺包括如下步骤:步骤一、根据墙体尺寸和模数确定混凝土包封尺寸;步骤二、通过模板支设并进行加固;步骤三、支设完成后浇筑与构造柱同等级的细石混凝土,浇筑过程进行振捣;步骤四、浇筑并养护完成后拆模。采用混凝土对配电箱进行包封使之成为可承受纵向压力的受力构件,可取消过梁预制和安装;按照墙体尺寸和模数确定包封厚度,使之成为可砌筑砌块,可采用传统抹灰砌筑方法施工,不再进行二次开槽。
Lintel-free non-grooving distribution box concrete encapsulating construction process
The invention discloses a lintel-free non-grooving distribution box concrete encapsulating construction process. The process comprises the following steps that 1, concrete encapsulating dimensions aredetermined based on dimensions of a wall and modulus; 2, formwork erecting is conducted and reinforcement is realized; 3, after erecting is completed, fine stone concrete at the same level as a construction column is cast, and concrete vibration is conducted in the process of casting; and 4, form stripping is conducted after casting and maintenance. By using concrete to encapsulate a distributionbox, the distribution box becomes a stress component which can bear vertical stresses, and lintel prefabrication and installation can be canceled; by determining the encapsulating thickness based onthe dimensions of the wall and the modulus, the wall becomes building blocks that can be built by bricklaying; and a traditional plastering bricklaying method can be adopted for construction and secondary grooving is omitted.
本发明公开了一种免过梁免开槽配电箱混凝土包封施工工艺,该工艺包括如下步骤:步骤一、根据墙体尺寸和模数确定混凝土包封尺寸;步骤二、通过模板支设并进行加固;步骤三、支设完成后浇筑与构造柱同等级的细石混凝土,浇筑过程进行振捣;步骤四、浇筑并养护完成后拆模。采用混凝土对配电箱进行包封使之成为可承受纵向压力的受力构件,可取消过梁预制和安装;按照墙体尺寸和模数确定包封厚度,使之成为可砌筑砌块,可采用传统抹灰砌筑方法施工,不再进行二次开槽。
Lintel-free non-grooving distribution box concrete encapsulating construction process
一种免过梁免开槽配电箱混凝土包封施工工艺
SUN FENGYAN (author) / LIU CHENGLIN (author)
2020-10-30
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Indoor distribution box notch lintel construction process
European Patent Office | 2020
|Concrete lintel construction structure and construction method thereof
European Patent Office | 2024
|Construction method for door opening without concrete lintel
European Patent Office | 2024
|PLATE-SHAPED HOUSING LINTEL AND LINTEL CONSTRUCTION METHOD USING THE SAME
European Patent Office | 2023
|