A platform for research: civil engineering, architecture and urbanism
Riverway landscape slope protection construction method
The invention relates to a riverway landscape slope protection construction method. The riverway landscape slope protection construction method uses a riverway landscape slope protection constructiondevice, the riverway landscape slope protection construction device comprises a slope body, an electric control vehicle, a fixing and limiting mechanism and a placing mechanism, wherein the electric control vehicle is connected with the existing ground where the slope body is located in a sliding fit mode, and the fixing and limiting mechanism is mounted at the right end of the electric control vehicle. The placing mechanism is mounted at the upper end of the fixing limiting mechanism in a sliding fit mode. According to the landscape slope protection construction device, landscape slope protection construction is conducted by adopting the design concept of a transverse and vertical continuous placement structure, and continuous transverse and vertical brick stacking construction can be performed on the surface of the slope body through cooperation of the placing mechanism and the fixing and limiting mechanism. Compared with a traditional single stacking mode adopting a manual mode, a mode adopted by the device can greatly improve the overall construction efficiency, and besides, a plurality of structures having the effect of improving the brick connecting tightness are arranged soas to improve the overall construction quality of slope protection.
本发明涉及一种河道景观护坡施工方法,其使用了一种河道景观护坡施工装置,该河道景观护坡施工装置包括坡体、电控车、固限机构和安放机构,所述的电控车通过滑动配合方式与坡体所在的已有地面相连,电控车的右端安装有固限机构,固限机构的上端通过滑动配合方式安装有安放机构,本发明采用横竖向连续安放结构的设计理念进行道景观护坡施工,通过安放机构和固限机构之间的配合可对坡体表面进行连续横竖向砖块码列施工,与传统通过人工方式单个码列方式相比,本装置采取的方式可大大提高整体施工效率,同时设置有多个具有提高砖块连接紧密度作用的结构以提高护坡整体的施工质量。
Riverway landscape slope protection construction method
The invention relates to a riverway landscape slope protection construction method. The riverway landscape slope protection construction method uses a riverway landscape slope protection constructiondevice, the riverway landscape slope protection construction device comprises a slope body, an electric control vehicle, a fixing and limiting mechanism and a placing mechanism, wherein the electric control vehicle is connected with the existing ground where the slope body is located in a sliding fit mode, and the fixing and limiting mechanism is mounted at the right end of the electric control vehicle. The placing mechanism is mounted at the upper end of the fixing limiting mechanism in a sliding fit mode. According to the landscape slope protection construction device, landscape slope protection construction is conducted by adopting the design concept of a transverse and vertical continuous placement structure, and continuous transverse and vertical brick stacking construction can be performed on the surface of the slope body through cooperation of the placing mechanism and the fixing and limiting mechanism. Compared with a traditional single stacking mode adopting a manual mode, a mode adopted by the device can greatly improve the overall construction efficiency, and besides, a plurality of structures having the effect of improving the brick connecting tightness are arranged soas to improve the overall construction quality of slope protection.
本发明涉及一种河道景观护坡施工方法,其使用了一种河道景观护坡施工装置,该河道景观护坡施工装置包括坡体、电控车、固限机构和安放机构,所述的电控车通过滑动配合方式与坡体所在的已有地面相连,电控车的右端安装有固限机构,固限机构的上端通过滑动配合方式安装有安放机构,本发明采用横竖向连续安放结构的设计理念进行道景观护坡施工,通过安放机构和固限机构之间的配合可对坡体表面进行连续横竖向砖块码列施工,与传统通过人工方式单个码列方式相比,本装置采取的方式可大大提高整体施工效率,同时设置有多个具有提高砖块连接紧密度作用的结构以提高护坡整体的施工质量。
Riverway landscape slope protection construction method
一种河道景观护坡施工方法
HU YANG (author) / ZOU SHUAIHU (author)
2020-11-03
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
European Patent Office | 2024
|Riverway ecological chain protection slope construction method
European Patent Office | 2020
|European Patent Office | 2024
|Integrated construction equipment for riverway slope protection
European Patent Office | 2024
|