A platform for research: civil engineering, architecture and urbanism
The invention discloses a civil engineering composite pile. The pile comprises a main pile body and a transverse pile body, a pile cap is arranged at the top of the main pile body and fixedly connected with the main pile body, transverse structural ribs are arranged in the pile cap and embedded in the pile cap, a fiber reinforced concrete column is arranged in the main pile body, and the fiber reinforced concrete column is tightly attached to the main pile body. According to the civil engineering composite pile, high-ductility cold-rolled ribbed steel bars are arranged in the fiber reinforcedconcrete column, the rolling control technology, the heat treatment temperature control technology and the numerical control flying shear and automatic material receiving technology are closely matched, and a brand-new cold-rolled steel bar production process device is formed; and reinforcing steel bars manufactured by the technology have extremely high steel strength and ductility, the strength of the composite pile can be greatly improved by using the high-ductility cold-rolled ribbed steel bars, and the composite pile has a good market at present.
本发明公开了一种土木工程组合桩,包括主桩和横桩,主桩的顶部设置有桩帽,且桩帽与主桩固定连接,桩帽的内部设置有横向构造筋,且横向构造筋嵌入设置在桩帽中,主桩的内部设置有纤维增强混凝土柱,且纤维增强混凝土柱与主桩紧密贴合,该种土木工程组合桩,纤维增强混凝土柱的内部设置有高延性冷轧带肋钢筋,控制轧制技术和热处理控温技术,以及数控飞剪、自动收料技术的紧密配合,形成了一套全新的冷轧钢筋生产工艺装置,运用这种技术制造的钢筋拥有极强的钢材强度和延性,使用高延性冷轧带肋钢筋能够大幅度提升本组合桩的强度,在现今能有良好的市场。
The invention discloses a civil engineering composite pile. The pile comprises a main pile body and a transverse pile body, a pile cap is arranged at the top of the main pile body and fixedly connected with the main pile body, transverse structural ribs are arranged in the pile cap and embedded in the pile cap, a fiber reinforced concrete column is arranged in the main pile body, and the fiber reinforced concrete column is tightly attached to the main pile body. According to the civil engineering composite pile, high-ductility cold-rolled ribbed steel bars are arranged in the fiber reinforcedconcrete column, the rolling control technology, the heat treatment temperature control technology and the numerical control flying shear and automatic material receiving technology are closely matched, and a brand-new cold-rolled steel bar production process device is formed; and reinforcing steel bars manufactured by the technology have extremely high steel strength and ductility, the strength of the composite pile can be greatly improved by using the high-ductility cold-rolled ribbed steel bars, and the composite pile has a good market at present.
本发明公开了一种土木工程组合桩,包括主桩和横桩,主桩的顶部设置有桩帽,且桩帽与主桩固定连接,桩帽的内部设置有横向构造筋,且横向构造筋嵌入设置在桩帽中,主桩的内部设置有纤维增强混凝土柱,且纤维增强混凝土柱与主桩紧密贴合,该种土木工程组合桩,纤维增强混凝土柱的内部设置有高延性冷轧带肋钢筋,控制轧制技术和热处理控温技术,以及数控飞剪、自动收料技术的紧密配合,形成了一套全新的冷轧钢筋生产工艺装置,运用这种技术制造的钢筋拥有极强的钢材强度和延性,使用高延性冷轧带肋钢筋能够大幅度提升本组合桩的强度,在现今能有良好的市场。
Civil engineering composite pile
一种土木工程组合桩
WANG JIASHUN (author)
2020-11-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen