Pitched roof concrete pouring construction method
The invention discloses a pitched roof concrete pouring construction method. The pitched roof concrete pouring construction method comprises the construction steps of 1, building a pitched roof formwork; 2, binding upper-layer and lower-layer plate surface reinforcing meshes on the pitched roof formwork; 3, pouring a first layer of concrete on the pitched roof formwork one by one by adopting a manner that a baffle with a steel bar notch is supported on plate surface reinforcing steel bars along with pouring to intercept concrete sliding, and pulling out the baffle only when the concrete losesfluidity in the pouring process; and 4, pouring a second layer of concrete on the first layer of concrete and finishing the surface. The baffle plate is adopted in the method to intercept concrete sliding, so that the concrete can be fully vibrated, and the compactness of the concrete is ensured. The method is easy to manufacture, convenient to construct, good in using effect and wide in application range.
本发明公开了一种坡屋面混凝土浇筑施工方法,其施工步骤为:①搭建坡屋面模板;②在坡屋面模板上绑扎出上、下层的板面钢筋网;③采用开设有钢筋豁口的挡板随浇随支于板面钢筋上拦截混凝土滑落而于坡屋面模板上逐片浇筑出第一层混凝土,浇筑过程中,待混凝土失去流动性时才抽出挡板;④于第一层混凝土上浇筑第二层混凝土并收面。本发明采用挡板可拦截混凝土下滑,使混凝土可以充分振捣,保证混凝土的密实度;本发明制作简单、施工方便,使用效果好,适用范围广。
Pitched roof concrete pouring construction method
The invention discloses a pitched roof concrete pouring construction method. The pitched roof concrete pouring construction method comprises the construction steps of 1, building a pitched roof formwork; 2, binding upper-layer and lower-layer plate surface reinforcing meshes on the pitched roof formwork; 3, pouring a first layer of concrete on the pitched roof formwork one by one by adopting a manner that a baffle with a steel bar notch is supported on plate surface reinforcing steel bars along with pouring to intercept concrete sliding, and pulling out the baffle only when the concrete losesfluidity in the pouring process; and 4, pouring a second layer of concrete on the first layer of concrete and finishing the surface. The baffle plate is adopted in the method to intercept concrete sliding, so that the concrete can be fully vibrated, and the compactness of the concrete is ensured. The method is easy to manufacture, convenient to construct, good in using effect and wide in application range.
本发明公开了一种坡屋面混凝土浇筑施工方法,其施工步骤为:①搭建坡屋面模板;②在坡屋面模板上绑扎出上、下层的板面钢筋网;③采用开设有钢筋豁口的挡板随浇随支于板面钢筋上拦截混凝土滑落而于坡屋面模板上逐片浇筑出第一层混凝土,浇筑过程中,待混凝土失去流动性时才抽出挡板;④于第一层混凝土上浇筑第二层混凝土并收面。本发明采用挡板可拦截混凝土下滑,使混凝土可以充分振捣,保证混凝土的密实度;本发明制作简单、施工方便,使用效果好,适用范围广。
Pitched roof concrete pouring construction method
坡屋面混凝土浇筑施工方法
ZHANG YUANFU (author) / DONG LIFENG (author) / WANG BO (author) / LI HAITAO (author) / LI MENGLONG (author) / ZHANG ZENGQIANG (author) / FENG CHANGWEI (author) / YANG SHIYING (author) / LU CHONGGAN (author)
2020-11-03
Patent
Electronic Resource
Chinese
Pitched roof concrete pouring auxiliary structure and pouring construction method
European Patent Office | 2024
|Spaced formwork supporting and concrete pouring method for pitched roof
European Patent Office | 2015
|Pre-cast concrete pitched roof construction
Engineering Index Backfile | 1943