The invention relates to a brushing construction process of a building external wall heat insulation coating. Equipment comprises a mounting table, a moving device, a spraying device and a brushing device, the moving device is mounted at the front end of the mounting table, the spraying device is mounted in the middle of the upper end of the mounting table, and the brushing device is arranged at the left side of the spraying device. According to the brushing construction process for the building external wall heat insulation coating, the problems that during manual brushing construction, an external wall is directly brushed manually, the high position of the building external wall is difficult to brush manually, scaffolds and the like need to be built for assistance, consequently, the manual brushing efficiency is low, when existing building external wall thermal insulation coating brushing equipment is used for brushing a building external wall thermal insulation coating, the thermalinsulation coating is usually and directly brushed and scraped to be flat, so that the thermal insulation coating is not uniformly brushed, a large number of thermal insulation coatings are wasted, inthe brushing process of the existing brushing equipment, the surface is rough, and the service life is affected are solved.
本发明涉及一种建筑外墙隔热保温涂层涂刷施工工艺,包括安装台、移动装置、喷料装置和涂刷装置,所述安装台前端安装有移动装置,安装台上端中部安装有喷料装置,喷料装置左侧设置有涂刷装置。本发明提供的一种建筑外墙隔热保温涂层涂刷施工工艺,可以解决人工涂刷施工时,直接通过人工对外墙进行涂刷,且人工难以对建筑外墙的高处进行涂刷,需要搭建脚手架等进行辅助,从而导致人工涂刷效率低以及现有建筑外墙隔热保温涂层涂刷设备在对建筑外墙隔热保温涂层进行涂刷施工时,通常直接对隔热保温涂层进行涂刷刮平,从而使得隔热保温涂层涂刷不均匀,导致浪费大量的隔热保温涂层,且现有涂刷设备涂刷过程中,表面较粗糙,影响使用寿命等问题。
The invention relates to a brushing construction process of a building external wall heat insulation coating. Equipment comprises a mounting table, a moving device, a spraying device and a brushing device, the moving device is mounted at the front end of the mounting table, the spraying device is mounted in the middle of the upper end of the mounting table, and the brushing device is arranged at the left side of the spraying device. According to the brushing construction process for the building external wall heat insulation coating, the problems that during manual brushing construction, an external wall is directly brushed manually, the high position of the building external wall is difficult to brush manually, scaffolds and the like need to be built for assistance, consequently, the manual brushing efficiency is low, when existing building external wall thermal insulation coating brushing equipment is used for brushing a building external wall thermal insulation coating, the thermalinsulation coating is usually and directly brushed and scraped to be flat, so that the thermal insulation coating is not uniformly brushed, a large number of thermal insulation coatings are wasted, inthe brushing process of the existing brushing equipment, the surface is rough, and the service life is affected are solved.
本发明涉及一种建筑外墙隔热保温涂层涂刷施工工艺,包括安装台、移动装置、喷料装置和涂刷装置,所述安装台前端安装有移动装置,安装台上端中部安装有喷料装置,喷料装置左侧设置有涂刷装置。本发明提供的一种建筑外墙隔热保温涂层涂刷施工工艺,可以解决人工涂刷施工时,直接通过人工对外墙进行涂刷,且人工难以对建筑外墙的高处进行涂刷,需要搭建脚手架等进行辅助,从而导致人工涂刷效率低以及现有建筑外墙隔热保温涂层涂刷设备在对建筑外墙隔热保温涂层进行涂刷施工时,通常直接对隔热保温涂层进行涂刷刮平,从而使得隔热保温涂层涂刷不均匀,导致浪费大量的隔热保温涂层,且现有涂刷设备涂刷过程中,表面较粗糙,影响使用寿命等问题。
Brushing construction process of building external wall heat insulation coating
一种建筑外墙隔热保温涂层涂刷施工工艺
ZHANG MEI (author)
2020-11-03
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Fabricated building external wall thermal insulation construction process
European Patent Office | 2022
|Building construction method of building external wall heat-insulation wall surface structure