Assembly type cable well
The invention discloses an assembly type cable well. The invention relates to the field of cable assembly equipment, in particular to an assembly type prefabricated multidirectional cable well. The assembly type cable well is provided, prefabricated parts are adopted for assembly operation on site, and therefore the construction period is greatly shortened. The manner that an original cable well is built on site is changed, and the manner is improved into the manner of fragmentation prefabrication, on-site excavation, assembly and landfill. The advantages of rear personnel and machinery are brought into full play, the influence of external climatic environment is avoided, and the construction influence of public places and roads is reduced to the maximum extent. Prefabricated processing iscarried out in a prefabrication factory, sufficient maintenance is carried out, the prefabricated parts are conveyed to a construction site to be hoisted, joint treatment is carried out in the splicing process, and it is guaranteed that the integrity is good and the anti-seismic property is improved by inserting reinforcing steel bars into reserved holes which are through up and down and pouringcement paste into the reserved holes. Therefore, the on-site construction period is greatly shortened, and the effects of reliable strength and convenient construction are achieved.
一种装配式电缆井。本发明涉及电缆装配设备领域,尤其涉及一种装配式预制多向电缆井。提出一种采用预制件在现场进行装配作业,进而大幅度减少施工周期的装配式电缆井。本发明改变了原有电缆井在现场砌筑的模式,改进为分片预制、现场开挖、装配、填埋;充分发挥后方的人员和机械优势,不受外部气候环境影响,最大限度减少公共场所、道路的施工影响。在预制厂进行预制加工、并充分养护,运至施工地点进行吊装,拼装过程中做好接缝处理,在预留的上下贯通的孔中,通过插入钢筋,灌注水泥浆,保证其整体性良好,抗震性能提升。从而大幅度缩短现场施工工期,达到强度可靠、施工便利的效果。
Assembly type cable well
The invention discloses an assembly type cable well. The invention relates to the field of cable assembly equipment, in particular to an assembly type prefabricated multidirectional cable well. The assembly type cable well is provided, prefabricated parts are adopted for assembly operation on site, and therefore the construction period is greatly shortened. The manner that an original cable well is built on site is changed, and the manner is improved into the manner of fragmentation prefabrication, on-site excavation, assembly and landfill. The advantages of rear personnel and machinery are brought into full play, the influence of external climatic environment is avoided, and the construction influence of public places and roads is reduced to the maximum extent. Prefabricated processing iscarried out in a prefabrication factory, sufficient maintenance is carried out, the prefabricated parts are conveyed to a construction site to be hoisted, joint treatment is carried out in the splicing process, and it is guaranteed that the integrity is good and the anti-seismic property is improved by inserting reinforcing steel bars into reserved holes which are through up and down and pouringcement paste into the reserved holes. Therefore, the on-site construction period is greatly shortened, and the effects of reliable strength and convenient construction are achieved.
一种装配式电缆井。本发明涉及电缆装配设备领域,尤其涉及一种装配式预制多向电缆井。提出一种采用预制件在现场进行装配作业,进而大幅度减少施工周期的装配式电缆井。本发明改变了原有电缆井在现场砌筑的模式,改进为分片预制、现场开挖、装配、填埋;充分发挥后方的人员和机械优势,不受外部气候环境影响,最大限度减少公共场所、道路的施工影响。在预制厂进行预制加工、并充分养护,运至施工地点进行吊装,拼装过程中做好接缝处理,在预留的上下贯通的孔中,通过插入钢筋,灌注水泥浆,保证其整体性良好,抗震性能提升。从而大幅度缩短现场施工工期,达到强度可靠、施工便利的效果。
Assembly type cable well
一种装配式电缆井
ZHANG XIANG (author) / NI WENJIE (author) / WANG QIUJUN (author) / NI HANQING (author) / QIU WENHUA (author) / WANG MENGCHAO (author)
2020-11-10
Patent
Electronic Resource
Chinese
Prefabricated assembly type octagonal cable well and construction method
European Patent Office | 2022
|Prefabricated assembly type octagonal cable well and construction method
European Patent Office | 2023
|Prefabricated assembly type cable working well and construction method thereof