Steel structure roof truss sliding construction method
The invention relates to a steel structure roof truss sliding construction method. The steel structure roof truss sliding construction method comprises the following steps that 1, a mid-span supporting frame is installed in a building main body, and a sliding rail is installed; 2, a scaffold construction platform is installed; 3, a truss is hoisted to the scaffold construction platform, so that the truss is in sliding fit with the sliding rail; 4, a pushing device is installed, and the pushing device pushes a supporting mechanism to enable the truss to slide to the temporary staying position;5, the next truss is hoisted to the scaffold construction platform, the previous truss is connected with the next truss, and the trusses are pushed to the temporary staying position; 6, the fifth stepis repeated, so that all trusses reach the preset installation position; and 7, the trusses are unloaded through an unloading mechanism, the supporting frame is detached, and steel structure roof truss construction is completed. The steel structure roof truss sliding construction method has the beneficial that the movement of the trusses can be more accurately controlled, and the construction difficulty is reduced.
本申请涉及一种钢结构屋架滑移施工方法,包括以下步骤:步骤一:在建筑物主体内安装跨中支撑架,安装滑移轨;步骤二:安装脚手架施工平台;步骤三:吊装桁架至脚手架施工平台,使桁架与滑移轨滑移配合;步骤四:安装顶推器,顶推器顶推支撑机构使桁架滑移至临时停留位置;步骤五:吊装后一个桁架吊装至脚手架施工平台,连接前一个桁架和后一个桁架,并推动至临时停留位置;步骤六:重复步骤五,使全部桁架均到达预定安装位置;步骤七:通过卸载机构卸载桁架,将拆卸支撑架,完成钢结构屋架施工;本申请具有更加准确的控制桁架的移动,降低施工难度的效果。
Steel structure roof truss sliding construction method
The invention relates to a steel structure roof truss sliding construction method. The steel structure roof truss sliding construction method comprises the following steps that 1, a mid-span supporting frame is installed in a building main body, and a sliding rail is installed; 2, a scaffold construction platform is installed; 3, a truss is hoisted to the scaffold construction platform, so that the truss is in sliding fit with the sliding rail; 4, a pushing device is installed, and the pushing device pushes a supporting mechanism to enable the truss to slide to the temporary staying position;5, the next truss is hoisted to the scaffold construction platform, the previous truss is connected with the next truss, and the trusses are pushed to the temporary staying position; 6, the fifth stepis repeated, so that all trusses reach the preset installation position; and 7, the trusses are unloaded through an unloading mechanism, the supporting frame is detached, and steel structure roof truss construction is completed. The steel structure roof truss sliding construction method has the beneficial that the movement of the trusses can be more accurately controlled, and the construction difficulty is reduced.
本申请涉及一种钢结构屋架滑移施工方法,包括以下步骤:步骤一:在建筑物主体内安装跨中支撑架,安装滑移轨;步骤二:安装脚手架施工平台;步骤三:吊装桁架至脚手架施工平台,使桁架与滑移轨滑移配合;步骤四:安装顶推器,顶推器顶推支撑机构使桁架滑移至临时停留位置;步骤五:吊装后一个桁架吊装至脚手架施工平台,连接前一个桁架和后一个桁架,并推动至临时停留位置;步骤六:重复步骤五,使全部桁架均到达预定安装位置;步骤七:通过卸载机构卸载桁架,将拆卸支撑架,完成钢结构屋架施工;本申请具有更加准确的控制桁架的移动,降低施工难度的效果。
Steel structure roof truss sliding construction method
一种钢结构屋架滑移施工方法
BU JIBIN (author) / WEN XILIAN (author) / LIU SANLING (author) / WANG ZHUOPENG (author) / ZHANG CHAOYANG (author) / ZHU XINPENG (author) / ZHANG ZHIXIANG (author)
2020-11-13
Patent
Electronic Resource
Chinese
Inclined sliding construction method for ultrahigh large-span roof steel truss
European Patent Office | 2024
|Steel structure workshop roof truss beam construction method
European Patent Office | 2022
|