Simple method for manually dismounting brick chimney
The invention provides a simple method for manually dismounting a brick chimney. The simple method comprises the steps that firstly, the bottom of the to-be-dismounted brick chimney 2 is used as the benchmark, and brick chimneys 3 to be equally divided and dismounted are formed within the range that the measuring height is 1 m; secondly, the brick chimneys 3 to be equally divided and dismounted are manually dismounted after being equally divided, specifically, after chiseling of one equally-divided brick setting is completed, supporting wood piles 4 are adopted for supporting, and the brick settings obtained after equal division are sequentially operated till all the brick chimneys 3 to be equally divided and dismounted are dismounted; and thirdly, inflammable matter is poured on the supporting wood piles 4, ignition is carried out to combust the supporting wood piles 4, the supporting wood piles 4 are away from the brick chimney, and the distance needs to be larger than 2 times of theheight of the chimney. The method is simple and convenient to operate, low in cost and economical and applicable, the danger brought by the operation that common dismounting methods need aerial workcan be avoided, the collapsing direction of the brick chimney can be decided by adjusting the supporting positions of the wood piles, and therefore unnecessary losses are prevented from being caused to surrounding buildings and life and property.
本发明提供了一种砖烟囱人工拆除简易方法;步骤一:以待拆除砖烟囱2的底部为基准,测量高度为1m范围内为待等分拆除砖烟囱3;步骤二:将待等分拆除砖烟囱3进行等分处理后进行人工拆除,具体为:每剔凿完一等分砖砌体后,均采用支撑木桩4进行支撑,各等分后的砖砌体依次进行,直待等分拆除砖烟囱3全部拆除;步骤三:将支撑木桩4浇上易燃性物质,点火燃烧支撑木桩4即可,远离砖烟囱,距离需大于烟囱高度2倍距离。本发明方法操作简便、成本较低,经济适用,可避免普通拆除方法需要高空作业带来的危险性,而且可以通过调整木桩支撑位置来决定砖烟囱倒塌的方向,以免对周边建筑物和生命财产造成不必要的损失。
Simple method for manually dismounting brick chimney
The invention provides a simple method for manually dismounting a brick chimney. The simple method comprises the steps that firstly, the bottom of the to-be-dismounted brick chimney 2 is used as the benchmark, and brick chimneys 3 to be equally divided and dismounted are formed within the range that the measuring height is 1 m; secondly, the brick chimneys 3 to be equally divided and dismounted are manually dismounted after being equally divided, specifically, after chiseling of one equally-divided brick setting is completed, supporting wood piles 4 are adopted for supporting, and the brick settings obtained after equal division are sequentially operated till all the brick chimneys 3 to be equally divided and dismounted are dismounted; and thirdly, inflammable matter is poured on the supporting wood piles 4, ignition is carried out to combust the supporting wood piles 4, the supporting wood piles 4 are away from the brick chimney, and the distance needs to be larger than 2 times of theheight of the chimney. The method is simple and convenient to operate, low in cost and economical and applicable, the danger brought by the operation that common dismounting methods need aerial workcan be avoided, the collapsing direction of the brick chimney can be decided by adjusting the supporting positions of the wood piles, and therefore unnecessary losses are prevented from being caused to surrounding buildings and life and property.
本发明提供了一种砖烟囱人工拆除简易方法;步骤一:以待拆除砖烟囱2的底部为基准,测量高度为1m范围内为待等分拆除砖烟囱3;步骤二:将待等分拆除砖烟囱3进行等分处理后进行人工拆除,具体为:每剔凿完一等分砖砌体后,均采用支撑木桩4进行支撑,各等分后的砖砌体依次进行,直待等分拆除砖烟囱3全部拆除;步骤三:将支撑木桩4浇上易燃性物质,点火燃烧支撑木桩4即可,远离砖烟囱,距离需大于烟囱高度2倍距离。本发明方法操作简便、成本较低,经济适用,可避免普通拆除方法需要高空作业带来的危险性,而且可以通过调整木桩支撑位置来决定砖烟囱倒塌的方向,以免对周边建筑物和生命财产造成不必要的损失。
Simple method for manually dismounting brick chimney
一种砖烟囱人工拆除的简易方法
MAO DONGXU (author) / ZHANG FENGLIANG (author) / YUN ZUOYI (author) / ZHANG SHAOXIONG (author)
2020-11-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Radial brick chimney construction
Engineering Index Backfile | 1931
Dismounting method of elevated derrick for building ultrahigh chimney