A platform for research: civil engineering, architecture and urbanism
The invention relates to a self-adhesive waterproof roll construction process. The self-adhesive waterproof roll construction process adopts the following waterproof roll construction device, and thewaterproof roll construction device comprises a supporting frame, a movable vertical plate, movable wheels, a limiting plate, a locking supporting plate, a connecting transverse plate and a roll coil.The construction process for the self-adhesive waterproof roll by adopting the waterproof roll construction device comprises the following steps of S1, base layer cleaning; S2, base layer line snapping; S3, waterproof roll installation; S4, waterproof roll pasting; and S5, waterproof roll laying. According to the self-adhesive waterproof roll construction process, the problems that in the existing manual laying process of the waterproof roll, long-distance waterproof roll laying needs to be carried out in a segmented mode, the waterproof roll can be twisted when a self-adhesive layer of the waterproof roll is integrally torn off, or sundries are adhered to a pasting layer, so that the laying of the waterproof roll is influenced, the waterproof roll is twisted due to the fact that the waterproof roll is not limited during pasting, and then the laying effect of the waterproof roll is poor can be solved.
本发明涉及一种自粘型防水卷材施工工艺,该自粘型防水卷材施工工艺采用如下防水卷材施工装置,防水卷材施工装置包括支撑架、移动立板、移动轮、限位板、锁定支板、连接横板和卷材卷;采用上述防水卷材施工装置对自粘型防水卷材的施工工艺,包括以下步骤:S1、基层清理;S2、基层弹线;S3、防水卷材安装;S4、防水卷材粘贴;S5、防水卷材铺设。本发明可以解决现有人工对防水卷材进行铺设时存在的:对于长距离的防水卷材铺设需要进行分段进行,且防水卷材的自粘层整体揭下时会造成防水卷材发生扭曲,或者粘贴层粘上杂物,影响防水卷材的铺设、防水卷材粘贴时无限位导致其铺设出现扭曲,造成防水卷材的铺设效果差等问题。
The invention relates to a self-adhesive waterproof roll construction process. The self-adhesive waterproof roll construction process adopts the following waterproof roll construction device, and thewaterproof roll construction device comprises a supporting frame, a movable vertical plate, movable wheels, a limiting plate, a locking supporting plate, a connecting transverse plate and a roll coil.The construction process for the self-adhesive waterproof roll by adopting the waterproof roll construction device comprises the following steps of S1, base layer cleaning; S2, base layer line snapping; S3, waterproof roll installation; S4, waterproof roll pasting; and S5, waterproof roll laying. According to the self-adhesive waterproof roll construction process, the problems that in the existing manual laying process of the waterproof roll, long-distance waterproof roll laying needs to be carried out in a segmented mode, the waterproof roll can be twisted when a self-adhesive layer of the waterproof roll is integrally torn off, or sundries are adhered to a pasting layer, so that the laying of the waterproof roll is influenced, the waterproof roll is twisted due to the fact that the waterproof roll is not limited during pasting, and then the laying effect of the waterproof roll is poor can be solved.
本发明涉及一种自粘型防水卷材施工工艺,该自粘型防水卷材施工工艺采用如下防水卷材施工装置,防水卷材施工装置包括支撑架、移动立板、移动轮、限位板、锁定支板、连接横板和卷材卷;采用上述防水卷材施工装置对自粘型防水卷材的施工工艺,包括以下步骤:S1、基层清理;S2、基层弹线;S3、防水卷材安装;S4、防水卷材粘贴;S5、防水卷材铺设。本发明可以解决现有人工对防水卷材进行铺设时存在的:对于长距离的防水卷材铺设需要进行分段进行,且防水卷材的自粘层整体揭下时会造成防水卷材发生扭曲,或者粘贴层粘上杂物,影响防水卷材的铺设、防水卷材粘贴时无限位导致其铺设出现扭曲,造成防水卷材的铺设效果差等问题。
Self-adhesive waterproof roll construction process
一种自粘型防水卷材施工工艺
2020-11-17
Patent
Electronic Resource
Chinese
Self-adhesive waterproof roll and production process thereof
European Patent Office | 2023
|Photovoltaic roof TPO self-adhesive waterproof roll construction method
European Patent Office | 2024
|Construction method of macromolecular self-adhesive film waterproof roll
European Patent Office | 2021
|