A platform for research: civil engineering, architecture and urbanism
Rapid installation method for roof face
The invention relates to a rapid installation method for a roof face. The method comprises the following steps of mounting ceiling joists on a structural floor slab serving as the roof face; mountinga leveling plate on the ceiling joists; coating the surface of the leveling plate with emulsion used for forming a curing layer; after the emulsion forms the curing layer, laying an emulsion paint accommodating layer; and spraying finish paint on the emulsion paint accommodating layer to finish the operation of the roof face. For the method, the drying period can be shortened, and thus the time efficiency is improved; the influence of dust on the body of a worker and the environment in the polishing process of putty is reduced; the problem of continuous release of indoor formaldehyde caused byplastering gypsum and putty is avoided, and thus environmental protection is better realized; moreover, in the new construction process of the roof face, environment-friendly materials which can be purchased in the market are used, and the visual impression and durability are kept consistent; and in addition, a lamp trough can be directly arranged in a leveling layer of the roof face, and protruding hanging is not needed.
本发明涉及一种顶面快速安装方法,包括:在作为顶面的结构楼板上安装吊顶龙骨;在所述吊顶龙骨上安装找平板;在所述找平板的表面涂刷用于形成固化层的乳液;待所述乳液形成固化层后,铺贴乳胶漆容纳层;在所述乳胶漆容纳层上喷涂面漆,完成顶面作业。本发明可以减少干燥期,提高时间效率;减少腻子打磨过程中的粉尘对工人身体、环境的影响;避免粉刷石膏和腻子导致的室内甲醛持续释放的问题,更加环保;并且,在顶面的施工新流程中,本发明使用的是现在市场上可以采购到的环保材料,视觉观感与耐用性保持一致;此外,灯槽可以直接做到顶面找平层中,无需突出挂装。
Rapid installation method for roof face
The invention relates to a rapid installation method for a roof face. The method comprises the following steps of mounting ceiling joists on a structural floor slab serving as the roof face; mountinga leveling plate on the ceiling joists; coating the surface of the leveling plate with emulsion used for forming a curing layer; after the emulsion forms the curing layer, laying an emulsion paint accommodating layer; and spraying finish paint on the emulsion paint accommodating layer to finish the operation of the roof face. For the method, the drying period can be shortened, and thus the time efficiency is improved; the influence of dust on the body of a worker and the environment in the polishing process of putty is reduced; the problem of continuous release of indoor formaldehyde caused byplastering gypsum and putty is avoided, and thus environmental protection is better realized; moreover, in the new construction process of the roof face, environment-friendly materials which can be purchased in the market are used, and the visual impression and durability are kept consistent; and in addition, a lamp trough can be directly arranged in a leveling layer of the roof face, and protruding hanging is not needed.
本发明涉及一种顶面快速安装方法,包括:在作为顶面的结构楼板上安装吊顶龙骨;在所述吊顶龙骨上安装找平板;在所述找平板的表面涂刷用于形成固化层的乳液;待所述乳液形成固化层后,铺贴乳胶漆容纳层;在所述乳胶漆容纳层上喷涂面漆,完成顶面作业。本发明可以减少干燥期,提高时间效率;减少腻子打磨过程中的粉尘对工人身体、环境的影响;避免粉刷石膏和腻子导致的室内甲醛持续释放的问题,更加环保;并且,在顶面的施工新流程中,本发明使用的是现在市场上可以采购到的环保材料,视觉观感与耐用性保持一致;此外,灯槽可以直接做到顶面找平层中,无需突出挂装。
Rapid installation method for roof face
一种顶面快速安装方法
ZHANG WEIJIA (author) / ZHANG YIRAN (author) / GUO HUI (author) / WANG ZICHENG (author) / QI GAOMING (author)
2020-11-24
Patent
Electronic Resource
Chinese
Rapid installation type roof multifunctional supporting device
European Patent Office | 2020
|Roof one-way installation assembly, roof base and roof base installation method
European Patent Office | 2023
|European Patent Office | 2016
|Rapid installation method of high-rise steel structure truss roof
European Patent Office | 2020
|