A platform for research: civil engineering, architecture and urbanism
Building glass curtain wall installation control method
The invention discloses a building glass curtain wall installation control method. The installation control method is achieved based on an auxiliary supporting framework, the auxiliary supporting framework comprises a base, a threaded column is integrally formed at the upper end of the base, clamping grooves are symmetrically formed in the threaded column, nuts are connected to the outer sides ofthe threaded column in a threaded mode, clamping blocks are connected to the clamping grooves in a clamped mode, the clamping blocks are symmetrically arranged on the inner side wall of a sleeve in anintegrally-formed mode, and the sleeve is arranged at the bottom end of a first supporting plate in an integrally-formed mode. The installation control method has the beneficial effects that curtainwall glass can be well installed and limited through a first limiting block, a second limiting block and a third limiting block, and the accuracy and safety of installation work are improved; and through arrangement of a first pressing plate, a second extrusion spring and a second pressing plate, auxiliary fixing work can be carried out on the glass, so that the efficiency of other construction work is improved, the mounting work efficiency of the curtain wall glass is improved, and the mounting and fixing work benefits are improved.
本发明公开了一种建筑玻璃幕墙安装控制方法,所述安装控制方法基于一辅助支撑架构来实现,辅助支撑架构包括底座,底座上端一体成型设置有螺纹柱、螺纹柱中对称设置有卡槽、外侧螺纹连接有螺母,卡槽卡接有卡块,并且卡块一体成型对称设置在套筒内侧壁上,套筒一体成型设置在第一支撑板底端,通过第一限位块、第二限位块和第三限位块能够对幕墙玻璃进行很好的安装限位,提高安装工作的精确性和安全性,通过第一压紧板、第二挤压弹簧、第二压紧板的设置可以对玻璃进行辅助固定工作,进而可以提高其它施工工作的效率,进而提高幕墙玻璃的安装工作效率,提高安装固定工作效益。
Building glass curtain wall installation control method
The invention discloses a building glass curtain wall installation control method. The installation control method is achieved based on an auxiliary supporting framework, the auxiliary supporting framework comprises a base, a threaded column is integrally formed at the upper end of the base, clamping grooves are symmetrically formed in the threaded column, nuts are connected to the outer sides ofthe threaded column in a threaded mode, clamping blocks are connected to the clamping grooves in a clamped mode, the clamping blocks are symmetrically arranged on the inner side wall of a sleeve in anintegrally-formed mode, and the sleeve is arranged at the bottom end of a first supporting plate in an integrally-formed mode. The installation control method has the beneficial effects that curtainwall glass can be well installed and limited through a first limiting block, a second limiting block and a third limiting block, and the accuracy and safety of installation work are improved; and through arrangement of a first pressing plate, a second extrusion spring and a second pressing plate, auxiliary fixing work can be carried out on the glass, so that the efficiency of other construction work is improved, the mounting work efficiency of the curtain wall glass is improved, and the mounting and fixing work benefits are improved.
本发明公开了一种建筑玻璃幕墙安装控制方法,所述安装控制方法基于一辅助支撑架构来实现,辅助支撑架构包括底座,底座上端一体成型设置有螺纹柱、螺纹柱中对称设置有卡槽、外侧螺纹连接有螺母,卡槽卡接有卡块,并且卡块一体成型对称设置在套筒内侧壁上,套筒一体成型设置在第一支撑板底端,通过第一限位块、第二限位块和第三限位块能够对幕墙玻璃进行很好的安装限位,提高安装工作的精确性和安全性,通过第一压紧板、第二挤压弹簧、第二压紧板的设置可以对玻璃进行辅助固定工作,进而可以提高其它施工工作的效率,进而提高幕墙玻璃的安装工作效率,提高安装固定工作效益。
Building glass curtain wall installation control method
一种建筑玻璃幕墙安装控制方法
ZHU ZHONGYAO (author)
2020-11-27
Patent
Electronic Resource
Chinese
High-rise building curtain wall glass installation construction method
European Patent Office | 2021
|Building glass curtain wall installation construction equipment and method
European Patent Office | 2024
|