Anti-leakage construction method for basement post-cast strip
The invention relates to the field of building construction, in particular to an anti-leakage construction method for a basement post-cast strip. The anti-leakage construction method comprises the following specific steps that step 1, a to-be-constructed area of the basement post-cast strip is cleaned, and a foundation bed is paved by concrete; step 2, after construction and maintenance of the foundation bed are completed, a layer of waterproof coiled material is paved on the foundation bed; step 3, the concrete is used for pouring a foundation body above the waterproof coiled material, and the foundation body is maintained; step 4, after maintenance of the foundation body is completed, the joint of the foundation body and the post-cast strip is roughened, and then the joint is coated witha bonding material layer; and step 5, the post-cast strip at the joint is poured by shrinkage-compensating concrete, and curing is carried out again. The anti-leakage construction method for the basement post-cast strip has the advantages of good waterproof and anti-leakage performance, simple structure and convenient construction.
本发明涉及建筑施工领域,具体涉及一种地下室后浇带防渗漏施工方法,具体步骤为:步骤1,对地下室后浇带待施工区域进行清理,使用混凝土铺垫基础垫层;步骤2,在基础垫层施工及养护完成后,在其上方铺设一层防水卷材;步骤3,使用混凝土在防水卷材的上方浇筑出基础主体,并对基础主体进行养护;步骤4,待基础主体养护完成,将其与后浇带的接缝处凿毛处理后,并涂覆粘结材料层;步骤5,采用补偿收缩混凝土在所述接缝处进行浇筑出后浇带,再次养护即可。本发明不仅具有防水防渗性能好的优点,而且还具有结构简单、施工方便的优点。
Anti-leakage construction method for basement post-cast strip
The invention relates to the field of building construction, in particular to an anti-leakage construction method for a basement post-cast strip. The anti-leakage construction method comprises the following specific steps that step 1, a to-be-constructed area of the basement post-cast strip is cleaned, and a foundation bed is paved by concrete; step 2, after construction and maintenance of the foundation bed are completed, a layer of waterproof coiled material is paved on the foundation bed; step 3, the concrete is used for pouring a foundation body above the waterproof coiled material, and the foundation body is maintained; step 4, after maintenance of the foundation body is completed, the joint of the foundation body and the post-cast strip is roughened, and then the joint is coated witha bonding material layer; and step 5, the post-cast strip at the joint is poured by shrinkage-compensating concrete, and curing is carried out again. The anti-leakage construction method for the basement post-cast strip has the advantages of good waterproof and anti-leakage performance, simple structure and convenient construction.
本发明涉及建筑施工领域,具体涉及一种地下室后浇带防渗漏施工方法,具体步骤为:步骤1,对地下室后浇带待施工区域进行清理,使用混凝土铺垫基础垫层;步骤2,在基础垫层施工及养护完成后,在其上方铺设一层防水卷材;步骤3,使用混凝土在防水卷材的上方浇筑出基础主体,并对基础主体进行养护;步骤4,待基础主体养护完成,将其与后浇带的接缝处凿毛处理后,并涂覆粘结材料层;步骤5,采用补偿收缩混凝土在所述接缝处进行浇筑出后浇带,再次养护即可。本发明不仅具有防水防渗性能好的优点,而且还具有结构简单、施工方便的优点。
Anti-leakage construction method for basement post-cast strip
一种地下室后浇带防渗漏施工方法
WANG QINGHAO (author) / JIN MINGCHUN (author) / MA YUXIA (author) / GONG SUNWU (author) / MEI CHUNYAN (author) / WANG BAIJUN (author) / ZHANG LIWANG (author)
2020-12-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
C08K
Verwendung von anorganischen oder nichtmakromolekularen organischen Stoffen als Zusatzstoffe
,
USE OF INORGANIC OR NON-MACROMOLECULAR ORGANIC SUBSTANCES AS COMPOUNDING INGREDIENTS
/
C08L
COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
,
Massen auf Basis makromolekularer Verbindungen
Anti-leakage construction method for post-cast strip of basement
European Patent Office | 2020
|Basement post-cast strip leakage-proof system and construction method thereof
European Patent Office | 2021
|