Building waterproof engineering waterproof construction post-processing method
The invention relates to a building waterproof engineering waterproof construction post-processing method. The building waterproof engineering waterproof construction post-processing method adopts a following waterproof construction post-processing device, the waterproof construction post-processing device comprises two symmetrically-arranged mobile vertical plates, mobile wheels, a support column, a guide mechanism, a transfer roller and a rolling mechanism. The building waterproof engineering waterproof construction post-processing method adopting the waterproof construction post-processingdevice comprises the following steps: S1, pre-processing a waterproof coiled material; S2, placing adhesive tape; S3, locking the adhesive tape; and S4, hot connection of the adhesive tape. Accordingto the building waterproof engineering waterproof construction post-processing method, the problems existing when the adhesive tape is manually thermally connected between waterproof coiled materialsin the prior art, when the adhesive tape is manually placed on a lap seam, the position of the adhesive tape can be dislocated and deformed, the adhesive tape can be heated to generate displacement when heated by an air heater, and the adhesive tape cannot be subjected to synchronous operation of melting and compacting when subjected to thermal connection can be solved.
本发明涉及一种建筑防水工程防水施工后处理方法,该建筑防水工程防水施工后处理方法采用如下防水施工后处理装置,防水施工后处理装置包括两个对称布置的移动立板、移动轮、支撑柱、导向机构、传送辊和滚压机构;采用上述防水施工后处理装置对建筑防水工程防水施工的后处理方法,包括以下步骤:S1、防水卷材预处理;S2、胶粘带安放;S3、胶粘带锁定;S4、胶粘带热接。本发明可以解决现有人工对胶粘带热接在防水卷材之间时存在的:人工将胶粘带放置在搭接缝上时,胶粘带的位置会发生错位变形,且胶粘带采用热风机进行加热时胶粘带会发生受热产生位移的情况、胶粘带热接时无法对其进行熔化和压实的同步操作等问题。
Building waterproof engineering waterproof construction post-processing method
The invention relates to a building waterproof engineering waterproof construction post-processing method. The building waterproof engineering waterproof construction post-processing method adopts a following waterproof construction post-processing device, the waterproof construction post-processing device comprises two symmetrically-arranged mobile vertical plates, mobile wheels, a support column, a guide mechanism, a transfer roller and a rolling mechanism. The building waterproof engineering waterproof construction post-processing method adopting the waterproof construction post-processingdevice comprises the following steps: S1, pre-processing a waterproof coiled material; S2, placing adhesive tape; S3, locking the adhesive tape; and S4, hot connection of the adhesive tape. Accordingto the building waterproof engineering waterproof construction post-processing method, the problems existing when the adhesive tape is manually thermally connected between waterproof coiled materialsin the prior art, when the adhesive tape is manually placed on a lap seam, the position of the adhesive tape can be dislocated and deformed, the adhesive tape can be heated to generate displacement when heated by an air heater, and the adhesive tape cannot be subjected to synchronous operation of melting and compacting when subjected to thermal connection can be solved.
本发明涉及一种建筑防水工程防水施工后处理方法,该建筑防水工程防水施工后处理方法采用如下防水施工后处理装置,防水施工后处理装置包括两个对称布置的移动立板、移动轮、支撑柱、导向机构、传送辊和滚压机构;采用上述防水施工后处理装置对建筑防水工程防水施工的后处理方法,包括以下步骤:S1、防水卷材预处理;S2、胶粘带安放;S3、胶粘带锁定;S4、胶粘带热接。本发明可以解决现有人工对胶粘带热接在防水卷材之间时存在的:人工将胶粘带放置在搭接缝上时,胶粘带的位置会发生错位变形,且胶粘带采用热风机进行加热时胶粘带会发生受热产生位移的情况、胶粘带热接时无法对其进行熔化和压实的同步操作等问题。
Building waterproof engineering waterproof construction post-processing method
一种建筑防水工程防水施工后处理方法
FAN MANXIANG (author)
2020-12-01
Patent
Electronic Resource
Chinese
Waterproof paint brushing construction method for building waterproof engineering
European Patent Office | 2021
|Building waterproof engineering construction treatment method
European Patent Office | 2022
|