High-fill embankment filling construction process
The invention provides a high-fill embankment filling construction process, and relates to the technical field of building construction processes. The high-fill embankment filling construction processspecifically comprises the following steps that S1, performing base treatment, specifically, treating a pavement foundation to be constructed; S2, performing layered filling, specifically, filling the embankment of the construction section in a layered mode, and performing filling of the next layer after filling of each layer is completed and compacted; S3, performing impact rolling; S4, arranging a temporary drainage system; S5, performing inspection and identification; S6, performing layer finishing; and S7, tampering the slope. According to the high-fill embankment filling construction process provided by the invention, the high-fill embankment can be filled in areas with poor soil and stone filler properties, much rainfall and poor roadbed stability through the construction process, and meanwhile, the situation of sedimentation after construction is completed can be avoided.
本发明提供一种高填方路堤填筑施工工艺,涉及建筑施工工艺技术领域。该高填方路堤填筑施工工艺,具体包括以下流程:S1.基底处理:对即将施工的路面地基进行处理;S2.分层填筑:对施工段路堤分层填筑,在每层填筑完成压实后进行下一层填筑;S3.冲击碾压;S4.设置临时排水系统;S5.检验鉴定;S6.层面整修;S7.边坡夯拍。本发明提供一种高填方路堤填筑施工工艺,通过该施工工艺可以在土石填料性质不良,降雨多,路基稳定性差的地区填筑高填方路堤,同时还可以避免施工完成后出现沉降的情况。
High-fill embankment filling construction process
The invention provides a high-fill embankment filling construction process, and relates to the technical field of building construction processes. The high-fill embankment filling construction processspecifically comprises the following steps that S1, performing base treatment, specifically, treating a pavement foundation to be constructed; S2, performing layered filling, specifically, filling the embankment of the construction section in a layered mode, and performing filling of the next layer after filling of each layer is completed and compacted; S3, performing impact rolling; S4, arranging a temporary drainage system; S5, performing inspection and identification; S6, performing layer finishing; and S7, tampering the slope. According to the high-fill embankment filling construction process provided by the invention, the high-fill embankment can be filled in areas with poor soil and stone filler properties, much rainfall and poor roadbed stability through the construction process, and meanwhile, the situation of sedimentation after construction is completed can be avoided.
本发明提供一种高填方路堤填筑施工工艺,涉及建筑施工工艺技术领域。该高填方路堤填筑施工工艺,具体包括以下流程:S1.基底处理:对即将施工的路面地基进行处理;S2.分层填筑:对施工段路堤分层填筑,在每层填筑完成压实后进行下一层填筑;S3.冲击碾压;S4.设置临时排水系统;S5.检验鉴定;S6.层面整修;S7.边坡夯拍。本发明提供一种高填方路堤填筑施工工艺,通过该施工工艺可以在土石填料性质不良,降雨多,路基稳定性差的地区填筑高填方路堤,同时还可以避免施工完成后出现沉降的情况。
High-fill embankment filling construction process
一种高填方路堤填筑施工工艺
YI WENLONG (author) / JIANG MIAOQIANG (author) / LI XIAOLONG (author) / QIAN ZHENYU (author) / ZHU JIGEN (author) / WANG QIANG (author) / LIU XINGBO (author) / SUN LEI (author) / CAO QINGGUO (author) / CHEN XIYANG (author)
2020-12-04
Patent
Electronic Resource
Chinese
Construction of hydraulic fill road embankment
Engineering Index Backfile | 1926
High-fill embankment drainage blind ditch and construction method
European Patent Office | 2020
|European Patent Office | 2021
|