The invention relates to the technical field of road engineering, in particular to a roadbed widening method with a road shoulder. According to the technical scheme, the method comprises the followingsteps that a soil retaining body foundation is built at the bottom of the outer side of an existing retaining wall according to the width needing to be widened of a roadbed; a soil retaining body isbuilt on the soil retaining body foundation; a gap between the existing retaining wall and the soil retaining body is filled with filling soil; the part, higher than the roadbed top, of the existing retaining wall is chiseled away; and a widened pavement is built at the top of the filled soil and the top of the chiseled existing retaining wall. The soil retaining body foundation and the soil retaining wall are arranged outside the existing retaining wall, the space between the existing retaining wall and the soil retaining body is filled with the filled soil, and the situation that the wall back of the new retaining wall cannot be filled with the soil or the filled soil cannot be compacted is avoided; meanwhile, the existing retaining wall is reserved, the existing retaining wall does notneed to be moved outwards, the existing roadbed can be rapidly widened, the requirement for different widening widths of the roadbed provided with the road shoulder is met, and therefore it is guaranteed that the side boundary of the roadbed is smooth and appropriate.
本发明涉及道路工程技术领域,具体涉及一种设路肩的路基拓宽方法;采用的技术方案是:包括以下步骤:根据路基所需拓宽的宽度,在既有挡墙外侧底部筑设挡土体基础;在挡土体基础上筑设挡土体;在既有挡墙和挡土体之间的空隙内填筑填土;将既有挡墙顶部高于路基顶部的部分凿除;在填土顶部和凿除后的既有挡墙顶部筑设加宽路面。本发明在既有挡墙外设置挡土体基础和挡土墙,并在既有挡墙和挡土体之间填筑填土,避免了新挡墙墙背无法填土或填土无法压实的情况;同时保留了既有挡墙,不需要外移既有挡墙,能够快速的对既有路基进行拓宽,满足设有路肩的路基不同拓宽宽度的需求,以保证路基边线顺适。
Roadbed widening method with road shoulder
The invention relates to the technical field of road engineering, in particular to a roadbed widening method with a road shoulder. According to the technical scheme, the method comprises the followingsteps that a soil retaining body foundation is built at the bottom of the outer side of an existing retaining wall according to the width needing to be widened of a roadbed; a soil retaining body isbuilt on the soil retaining body foundation; a gap between the existing retaining wall and the soil retaining body is filled with filling soil; the part, higher than the roadbed top, of the existing retaining wall is chiseled away; and a widened pavement is built at the top of the filled soil and the top of the chiseled existing retaining wall. The soil retaining body foundation and the soil retaining wall are arranged outside the existing retaining wall, the space between the existing retaining wall and the soil retaining body is filled with the filled soil, and the situation that the wall back of the new retaining wall cannot be filled with the soil or the filled soil cannot be compacted is avoided; meanwhile, the existing retaining wall is reserved, the existing retaining wall does notneed to be moved outwards, the existing roadbed can be rapidly widened, the requirement for different widening widths of the roadbed provided with the road shoulder is met, and therefore it is guaranteed that the side boundary of the roadbed is smooth and appropriate.
本发明涉及道路工程技术领域,具体涉及一种设路肩的路基拓宽方法;采用的技术方案是:包括以下步骤:根据路基所需拓宽的宽度,在既有挡墙外侧底部筑设挡土体基础;在挡土体基础上筑设挡土体;在既有挡墙和挡土体之间的空隙内填筑填土;将既有挡墙顶部高于路基顶部的部分凿除;在填土顶部和凿除后的既有挡墙顶部筑设加宽路面。本发明在既有挡墙外设置挡土体基础和挡土墙,并在既有挡墙和挡土体之间填筑填土,避免了新挡墙墙背无法填土或填土无法压实的情况;同时保留了既有挡墙,不需要外移既有挡墙,能够快速的对既有路基进行拓宽,满足设有路肩的路基不同拓宽宽度的需求,以保证路基边线顺适。
Roadbed widening method with road shoulder
一种设路肩的路基拓宽方法
WANG XIBAO (author) / YUAN SONG (author) / ZHOU JIEBIN (author) / ZHANG SHENG (author)
2020-12-04
Patent
Electronic Resource
Chinese
Roadbed splicing structure for road widening construction
European Patent Office | 2022
|