Road repairing construction process for filling-digging junction roadbed section
The invention provides a filling and excavating junction roadbed section disease repairing construction process. The process comprises the following steps: 1) hole site arrangement; 2) forming holes;forming holes in the surface layer through a drilling machine, and punching the surface layer through; 3) hole cleaning; muck and bad soil in the holes are blown and swept cleanly; 4) lowering a grouting pipe; 5) pile body filling; 6) preparing slurry; preparing slurry according to a water cement ratio of 0.8: 1.0, and fully and uniformly stirring the slurry; 7) hole sealing; 50 cm C30 cement concrete is adopted for pouring and hole sealing; a grouting guide pipe is inserted into the grouting pipe and extends out of the road surface by 20 cm, and after grouting is completed, the grouting guidepipe is cut off till the road surface is flush; and 8) grouting; injecting the prepared slurry into the holes; the problems that a roadbed slips, sinks, pits and the like due to long-term use of an existing filling and excavating junction roadbed section road, then cracks and net cracks of a road surface layer are caused, road safety is reduced, and comfort and stability of the road are affectedare solved.
本发明提供了一种填挖交界路基路段病害修复施工工艺,包括以下步骤:1)孔位布置;2)成孔;用钻机在面层上开孔,打穿面层;3)清孔;将孔内的渣土及坏土吹扫干净;4)下注浆管;5)桩身填筑;6)制备浆液;按照水灰比为0.8:1.0的比例制备浆液,将浆液充分搅拌均匀;7)封孔;采用50cm C30水泥混凝土进行浇筑封孔;注浆管内插入注浆导管,注浆导管伸出路面20cm,待注浆完成后,割断至路面齐平;8)注浆;制备好的浆液注入孔内;解决了现有填挖交界路基路段道路长期使用导致出现路基滑移、沉陷、坑槽等问题,进而导致道路面层裂缝、网裂,降低道路安全性,影响道路的舒适性和稳定性的问题。
Road repairing construction process for filling-digging junction roadbed section
The invention provides a filling and excavating junction roadbed section disease repairing construction process. The process comprises the following steps: 1) hole site arrangement; 2) forming holes;forming holes in the surface layer through a drilling machine, and punching the surface layer through; 3) hole cleaning; muck and bad soil in the holes are blown and swept cleanly; 4) lowering a grouting pipe; 5) pile body filling; 6) preparing slurry; preparing slurry according to a water cement ratio of 0.8: 1.0, and fully and uniformly stirring the slurry; 7) hole sealing; 50 cm C30 cement concrete is adopted for pouring and hole sealing; a grouting guide pipe is inserted into the grouting pipe and extends out of the road surface by 20 cm, and after grouting is completed, the grouting guidepipe is cut off till the road surface is flush; and 8) grouting; injecting the prepared slurry into the holes; the problems that a roadbed slips, sinks, pits and the like due to long-term use of an existing filling and excavating junction roadbed section road, then cracks and net cracks of a road surface layer are caused, road safety is reduced, and comfort and stability of the road are affectedare solved.
本发明提供了一种填挖交界路基路段病害修复施工工艺,包括以下步骤:1)孔位布置;2)成孔;用钻机在面层上开孔,打穿面层;3)清孔;将孔内的渣土及坏土吹扫干净;4)下注浆管;5)桩身填筑;6)制备浆液;按照水灰比为0.8:1.0的比例制备浆液,将浆液充分搅拌均匀;7)封孔;采用50cm C30水泥混凝土进行浇筑封孔;注浆管内插入注浆导管,注浆导管伸出路面20cm,待注浆完成后,割断至路面齐平;8)注浆;制备好的浆液注入孔内;解决了现有填挖交界路基路段道路长期使用导致出现路基滑移、沉陷、坑槽等问题,进而导致道路面层裂缝、网裂,降低道路安全性,影响道路的舒适性和稳定性的问题。
Road repairing construction process for filling-digging junction roadbed section
一种填挖交界路基路段道路修复施工工艺
BAI DONGXIAO (author) / WEN LIANGHUI (author) / WANG SHUXIN (author) / HAO XIN (author)
2020-12-04
Patent
Electronic Resource
Chinese
Filling and digging junction roadbed road section disease repair construction process
European Patent Office | 2021
|Roadbed structure at road filling and digging junction and construction method thereof
European Patent Office | 2023
|