A platform for research: civil engineering, architecture and urbanism
Automatic telescopic pile foundation pouring guide pipe
The invention discloses an automatic telescopic pile foundation pouring guide pipe. The automatic telescopic pile foundation pouring guide pipe comprises a telescopic guide pipe body, a contact head,an infrared distance measuring instrument and handheld terminal equipment, wherein the telescopic guide pipe body is inserted into slurry in a telescopic mode; the contact head is installed at the bottom end of the telescopic guide pipe body; the infrared distance measuring instrument is installed at the contact head and used for measuring the distance between the highest point of concrete and thecontact head in real time; and the handheld terminal equipment is connected with the telescopic guide pipe body and the infrared distance measuring instrument and used for controlling the telescopicguide pipe body to stretch out and draw back and collecting data transmitted by the infrared distance measuring instrument. The automatic telescopic pile foundation pouring guide pipe is convenient tomeasure and disassemble, the distance between the highest point of the concrete and the contact head can be measured in real time through the infrared distance measuring instrument, the data of eachtime are transmitted to a land terminal, and ground personnel start to control the telescopic guide pipe body to stretch out and draw back according to the received data.
本发明公开了一种自动伸缩式桩基浇筑导管,包括伸缩导管,以可伸缩的方式插入泥浆中;接触头,安装在伸缩导管的底端;红外线测距仪,安装在所述接触头处,用于对混凝土最高点到接触头的距离进行实时测量;手持终端设备,与所述伸缩导管和红外线测距仪连接,用于控制所述伸缩导管的伸缩以及收集所述红外线测距仪传输的数据。本发明的自动伸缩式桩基浇筑导管便于测量和拆卸,通过红外线测距装置即可将混凝土最高点到接触头的距离实时进行测量,将每次的数据传输到陆地终端,地面人员根据接受到的数据开始控制伸缩导管进行伸缩。
Automatic telescopic pile foundation pouring guide pipe
The invention discloses an automatic telescopic pile foundation pouring guide pipe. The automatic telescopic pile foundation pouring guide pipe comprises a telescopic guide pipe body, a contact head,an infrared distance measuring instrument and handheld terminal equipment, wherein the telescopic guide pipe body is inserted into slurry in a telescopic mode; the contact head is installed at the bottom end of the telescopic guide pipe body; the infrared distance measuring instrument is installed at the contact head and used for measuring the distance between the highest point of concrete and thecontact head in real time; and the handheld terminal equipment is connected with the telescopic guide pipe body and the infrared distance measuring instrument and used for controlling the telescopicguide pipe body to stretch out and draw back and collecting data transmitted by the infrared distance measuring instrument. The automatic telescopic pile foundation pouring guide pipe is convenient tomeasure and disassemble, the distance between the highest point of the concrete and the contact head can be measured in real time through the infrared distance measuring instrument, the data of eachtime are transmitted to a land terminal, and ground personnel start to control the telescopic guide pipe body to stretch out and draw back according to the received data.
本发明公开了一种自动伸缩式桩基浇筑导管,包括伸缩导管,以可伸缩的方式插入泥浆中;接触头,安装在伸缩导管的底端;红外线测距仪,安装在所述接触头处,用于对混凝土最高点到接触头的距离进行实时测量;手持终端设备,与所述伸缩导管和红外线测距仪连接,用于控制所述伸缩导管的伸缩以及收集所述红外线测距仪传输的数据。本发明的自动伸缩式桩基浇筑导管便于测量和拆卸,通过红外线测距装置即可将混凝土最高点到接触头的距离实时进行测量,将每次的数据传输到陆地终端,地面人员根据接受到的数据开始控制伸缩导管进行伸缩。
Automatic telescopic pile foundation pouring guide pipe
一种自动伸缩式桩基浇筑导管
YANG SHANGLIN (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile foundation concrete multi-guide-pipe pouring auxiliary system and pouring method
European Patent Office | 2024
|Buffering structure of pile foundation concrete pouring guide pipe
European Patent Office | 2023
|Automatic quantitative pouring equipment for pile foundation
European Patent Office | 2024
|Automatic conveying equipment for pile foundation pouring concrete
European Patent Office | 2020
|