A platform for research: civil engineering, architecture and urbanism
Modular detachable hanging device for roof floor board
The invention discloses a modular detachable hanging device for a roof floor board. The modular detachable hanging device comprises a first shell, wherein a balancing weight is welded to the bottom wall of the interior of the first shell; a first motor is installed on the upper surface of the balancing weight; a first rod body is welded to the output end of the first motor; the top of the first rod body penetrates through the top wall of the interior of the first shell and is welded to a first board body; the first motor drives the first rod body and the first board body to rotate, so that a second shell, a second board body, a third board body and a fourth board body are driven to rotate, and the board is moved; a second motor drives a gear to rotate, so that the third board body moves upand down; an electromagnet drives a second sliding block to slide in a first groove, so that the board is placed; a first sliding block slides into a third groove, the third board body slides out ofthe second board body, so that the third board body and the fourth board body are disassembled; and a second pipe body slides in a first pipe body, so that the second shell is disassembled.
本发明公开了一种楼顶地面板材的模块式可拆卸吊挂装置,包括第一壳体,所述第一壳体的内部底壁焊接有配重块,所述配重块的上表面安装有第一电机,所述第一电机的输出端焊接有第一杆体,所述第一杆体的顶部贯穿所述第一壳体的内部顶壁且焊接有第一板体;第一电机带动第一杆体和第一板体转动,从而带动第二壳体、第二板体、第三板体和第四板体转动,对板材进行移动,第二电机带动齿轮转动,使得第三板体上下移动,电磁铁带动第二滑块在第一凹槽的内部滑动,从而对板材进行放置,将第一滑块滑动到第三凹槽的内部,将第三板体滑出第二板体,从而对第三板体和第四板体进行拆卸,通过第二管体在第一管体的内部滑动,从而对第二壳体进行拆卸。
Modular detachable hanging device for roof floor board
The invention discloses a modular detachable hanging device for a roof floor board. The modular detachable hanging device comprises a first shell, wherein a balancing weight is welded to the bottom wall of the interior of the first shell; a first motor is installed on the upper surface of the balancing weight; a first rod body is welded to the output end of the first motor; the top of the first rod body penetrates through the top wall of the interior of the first shell and is welded to a first board body; the first motor drives the first rod body and the first board body to rotate, so that a second shell, a second board body, a third board body and a fourth board body are driven to rotate, and the board is moved; a second motor drives a gear to rotate, so that the third board body moves upand down; an electromagnet drives a second sliding block to slide in a first groove, so that the board is placed; a first sliding block slides into a third groove, the third board body slides out ofthe second board body, so that the third board body and the fourth board body are disassembled; and a second pipe body slides in a first pipe body, so that the second shell is disassembled.
本发明公开了一种楼顶地面板材的模块式可拆卸吊挂装置,包括第一壳体,所述第一壳体的内部底壁焊接有配重块,所述配重块的上表面安装有第一电机,所述第一电机的输出端焊接有第一杆体,所述第一杆体的顶部贯穿所述第一壳体的内部顶壁且焊接有第一板体;第一电机带动第一杆体和第一板体转动,从而带动第二壳体、第二板体、第三板体和第四板体转动,对板材进行移动,第二电机带动齿轮转动,使得第三板体上下移动,电磁铁带动第二滑块在第一凹槽的内部滑动,从而对板材进行放置,将第一滑块滑动到第三凹槽的内部,将第三板体滑出第二板体,从而对第三板体和第四板体进行拆卸,通过第二管体在第一管体的内部滑动,从而对第二壳体进行拆卸。
Modular detachable hanging device for roof floor board
一种楼顶地面板材的模块式可拆卸吊挂装置
WANG JIANSHENG (author) / ZHANG ZEYONG (author) / HU JIAN (author) / MENG XIAOKE (author) / XU HONGWEI (author) / GENG CHUNLEI (author) / FAN KAI (author) / HE ZHENGYING (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Roof object hanging hole structure with detachable hoisting steel beam
European Patent Office | 2021
|DETACHABLE HANGING STRUCTURE FOR HANGING A HAND SHOWER HEAD AND A DETACHABLE HANGING STRUCTURE
European Patent Office | 2018
|