A platform for research: civil engineering, architecture and urbanism
Cup-shaped foundation concrete computerized modeling method
The invention provides a cup-shaped foundation concrete computerized modeling method which comprises the following steps: a basic primitive establishing step: establishing a bottom basic primitive according to a design drawing of a cup-shaped foundation; a joint bar primitive establishing step: establishing joint bar primitives according to the design drawing of the cup-shaped foundation, and calculating the engineering quantity of joint bars; an anchor bar primitive establishing step: establishing the anchor bar primitives according to the design drawing of the cup-shaped foundation, and calculating the engineering quantity of anchor bars; a stirrup primitive establishing step: establishing the stirrup primitives according to the design drawing of the cup-shaped foundation, and calculating the engineering quantity of stirrups; and a combination step: combining the joint bar primitives, the anchor bar primitives, the stirrup primitives and the cup opening model. According to the method, the concrete work amount of the cup-shaped foundation can be accurately calculated, cup-shaped foundation integrated calculation combined modeling and steel bar fine adjustment are achieved, the budget and binding amount difference is reduced, an accurate work amount calculation basis is provided for subsequent construction, manual calculation is not needed, calculation missing or repeated calculation is avoided, and the calculation accuracy is improved.
本发明提供了一种杯型基础混凝土电算建模方法,该方法包括如下步骤:基础图元建立步骤,根据杯型基础的设计图纸建立底部基础图元;插筋图元建立步骤,根据杯型基础的设计图纸建立插筋图元,并计算插筋的工程量;锚筋图元建立步骤,根据杯型基础的设计图纸建立锚筋图元,并计算锚筋的工程量;箍筋图元建立步骤,根据杯型基础的设计图纸建立箍筋图元,并计算箍筋的工程量;组合步骤,将插筋图元、锚筋图元、箍筋图元和杯口模型组合。本发明能准确地计算杯型基础混凝土工程量,实现了杯型基础一体化电算组合建模及钢筋精细化调整,缩小了预算与绑扎量差,为后续施工提供了精确的工程量计算依据,无需手算,避免漏算或者重复计算,提高计算的准确性。
Cup-shaped foundation concrete computerized modeling method
The invention provides a cup-shaped foundation concrete computerized modeling method which comprises the following steps: a basic primitive establishing step: establishing a bottom basic primitive according to a design drawing of a cup-shaped foundation; a joint bar primitive establishing step: establishing joint bar primitives according to the design drawing of the cup-shaped foundation, and calculating the engineering quantity of joint bars; an anchor bar primitive establishing step: establishing the anchor bar primitives according to the design drawing of the cup-shaped foundation, and calculating the engineering quantity of anchor bars; a stirrup primitive establishing step: establishing the stirrup primitives according to the design drawing of the cup-shaped foundation, and calculating the engineering quantity of stirrups; and a combination step: combining the joint bar primitives, the anchor bar primitives, the stirrup primitives and the cup opening model. According to the method, the concrete work amount of the cup-shaped foundation can be accurately calculated, cup-shaped foundation integrated calculation combined modeling and steel bar fine adjustment are achieved, the budget and binding amount difference is reduced, an accurate work amount calculation basis is provided for subsequent construction, manual calculation is not needed, calculation missing or repeated calculation is avoided, and the calculation accuracy is improved.
本发明提供了一种杯型基础混凝土电算建模方法,该方法包括如下步骤:基础图元建立步骤,根据杯型基础的设计图纸建立底部基础图元;插筋图元建立步骤,根据杯型基础的设计图纸建立插筋图元,并计算插筋的工程量;锚筋图元建立步骤,根据杯型基础的设计图纸建立锚筋图元,并计算锚筋的工程量;箍筋图元建立步骤,根据杯型基础的设计图纸建立箍筋图元,并计算箍筋的工程量;组合步骤,将插筋图元、锚筋图元、箍筋图元和杯口模型组合。本发明能准确地计算杯型基础混凝土工程量,实现了杯型基础一体化电算组合建模及钢筋精细化调整,缩小了预算与绑扎量差,为后续施工提供了精确的工程量计算依据,无需手算,避免漏算或者重复计算,提高计算的准确性。
Cup-shaped foundation concrete computerized modeling method
杯型基础混凝土电算建模方法
AN JIFU (author) / SONG SAIZHONG (author) / ZHANG TING (author) / HE QIANSHU (author) / JIN LIAODONG (author)
2020-12-11
Patent
Electronic Resource
Chinese
Prefabricated prestressed strip-shaped reinforced concrete foundation
European Patent Office | 2021
|Computerized Approach to Foundation Inspection
British Library Conference Proceedings | 1996
|Computerized Approach to Bridge Foundation Inspection
Online Contents | 1996
|Prefabricated concrete T-shaped column cup opening foundation
European Patent Office | 2021
|Inverted T-shaped prestressed concrete tower crane foundation structure
European Patent Office | 2023
|