A platform for research: civil engineering, architecture and urbanism
Road drainage pipe construction device and method
The invention relates to a road drainage pipe construction device and method. The road drainage pipe construction device comprises a walking mechanism and racks fixedly arranged at the two ends of thewalking mechanism., wherein a sliding rail is arranged at the top of each rack; the end of each sliding rail extends to the outer side of the walking mechanism; a cross beam is arranged above the walking mechanism; the two ends of the cross beam are slidably arranged on the two sliding rails correspondingly; a first driving mechanism used for driving the cross beam to move is arranged on the cross beam; the road drainage pipe construction device further comprises a first telescopic arm and a second telescopic arm; a positioning clamping jaw is arranged at the bottom end of the first telescopic arm; the top end of the first telescopic arm is fixedly arranged on the cross beam; a grabbing mechanism is arranged at the bottom end of the second telescopic arm; the top end of the second telescopic arm is fixedly arranged on a walking trolley on the top face of the cross beam; a second driving piece used for driving the walking trolley to move is arranged on the cross beam; and a third driving mechanism used for driving the first telescopic arm and the second telescopic arm to stretch and retract synchronously is arranged between the first telescopic arm and the second telescopic arm. According to the road drainage pipe construction device and method, the mounting construction efficiency can be improved so as to meet the requirement of modern construction for the construction speed.
本申请涉及一种道路排水管施工设备及方法,包括行走机构以及固设于行走机构两端的机架,每个机架顶部均设有滑轨,每个滑轨的端部均延伸至行走机构外侧;行走机构上方设有横梁,横梁两端分别滑动设置于两个滑轨上,横梁上设有用于驱动横梁移动的第一驱动机构;还包括设有第一伸缩臂以及第二伸缩臂,第一伸缩臂底端设有定位卡爪,第一伸缩臂顶端固设于横梁上,第二伸缩臂底端设有抓取机构,第二伸缩臂顶端固设于横梁顶面的行走小车上,横梁上设有用于驱动行走小车移动的第二驱动件,第一伸缩臂与第二伸缩臂之间设有用于驱动第一伸缩臂与第二伸缩臂同步伸缩的第三驱动机构。本申请能够提高安装施工的效率以满足现代化建设对施工速度的要求。
Road drainage pipe construction device and method
The invention relates to a road drainage pipe construction device and method. The road drainage pipe construction device comprises a walking mechanism and racks fixedly arranged at the two ends of thewalking mechanism., wherein a sliding rail is arranged at the top of each rack; the end of each sliding rail extends to the outer side of the walking mechanism; a cross beam is arranged above the walking mechanism; the two ends of the cross beam are slidably arranged on the two sliding rails correspondingly; a first driving mechanism used for driving the cross beam to move is arranged on the cross beam; the road drainage pipe construction device further comprises a first telescopic arm and a second telescopic arm; a positioning clamping jaw is arranged at the bottom end of the first telescopic arm; the top end of the first telescopic arm is fixedly arranged on the cross beam; a grabbing mechanism is arranged at the bottom end of the second telescopic arm; the top end of the second telescopic arm is fixedly arranged on a walking trolley on the top face of the cross beam; a second driving piece used for driving the walking trolley to move is arranged on the cross beam; and a third driving mechanism used for driving the first telescopic arm and the second telescopic arm to stretch and retract synchronously is arranged between the first telescopic arm and the second telescopic arm. According to the road drainage pipe construction device and method, the mounting construction efficiency can be improved so as to meet the requirement of modern construction for the construction speed.
本申请涉及一种道路排水管施工设备及方法,包括行走机构以及固设于行走机构两端的机架,每个机架顶部均设有滑轨,每个滑轨的端部均延伸至行走机构外侧;行走机构上方设有横梁,横梁两端分别滑动设置于两个滑轨上,横梁上设有用于驱动横梁移动的第一驱动机构;还包括设有第一伸缩臂以及第二伸缩臂,第一伸缩臂底端设有定位卡爪,第一伸缩臂顶端固设于横梁上,第二伸缩臂底端设有抓取机构,第二伸缩臂顶端固设于横梁顶面的行走小车上,横梁上设有用于驱动行走小车移动的第二驱动件,第一伸缩臂与第二伸缩臂之间设有用于驱动第一伸缩臂与第二伸缩臂同步伸缩的第三驱动机构。本申请能够提高安装施工的效率以满足现代化建设对施工速度的要求。
Road drainage pipe construction device and method
一种道路排水管施工设备及方法
LI WENBIN (author) / LI CANGUI (author) / HUANG YEXIONG (author)
2020-12-15
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Drainage pipe construction device and drainage pipe construction method
European Patent Office | 2020
|Water-permeable concrete road drainage pipe network device and construction method
European Patent Office | 2023
|Municipal road drainage pipe network and construction technology thereof
European Patent Office | 2024
|