A platform for research: civil engineering, architecture and urbanism
Prestressed composite anchor cable uplift pile and preparation method thereof
The invention belongs to the field of underground construction, and particularly relates to a prestressed composite anchor cable uplift pile and a preparation method thereof. The prestressed compositeanchor cable uplift pile is characterized by comprising an uplift pile cage outer wall, an uplift pile cage inner wall, a composite anchor cable and a filler, wherein the composite anchor cable is arranged between the uplift pile cage outer wall and the uplift pile cage inner wall, the composite anchor cable is composed of an isolation body and an uplift anchor cable arranged in the isolation body, and the isolation body separates a corrosive from the uplift anchor cable. The prestressed composite anchor cable uplift pile can avoid the problems that a steel strand cannot be placed into the bottom of a hole due to disorder in the hole entering process, the steel strand is prone to corrosion, and especially underground water at the lower part of a pile body enters concrete and causes corrosion due to tiny cracks generated by tensile stress; and the upper part of the pile body is always in a pressed state, so that the cracks are avoided, and the overall supporting performance of a pile cage is good.
本发明属于地下施工领域,具体涉及一种预应力复合锚索抗拔桩及其制备方法。预应力复合锚索抗拔桩,抗拔桩,其特征在于:包括:抗拔桩笼外壁,抗拔桩笼内壁,复合锚索,复合锚索设置在抗拔桩笼外壁和抗拔桩笼内壁之间,复合锚索由隔离体、设置在隔离体内的抗拔锚索组成,隔离体将腐蚀物和抗拔锚索隔开;填装物。本发明能够避免钢绞线入孔过程中会搅乱无法放入孔底,钢绞线容易被腐蚀、尤其是桩身下部地下水进入混凝土因拉应力产生微小裂缝导致的腐蚀的问题,桩身上部一直处于受压状态避免了裂缝产生,桩笼整体支撑性好。
Prestressed composite anchor cable uplift pile and preparation method thereof
The invention belongs to the field of underground construction, and particularly relates to a prestressed composite anchor cable uplift pile and a preparation method thereof. The prestressed compositeanchor cable uplift pile is characterized by comprising an uplift pile cage outer wall, an uplift pile cage inner wall, a composite anchor cable and a filler, wherein the composite anchor cable is arranged between the uplift pile cage outer wall and the uplift pile cage inner wall, the composite anchor cable is composed of an isolation body and an uplift anchor cable arranged in the isolation body, and the isolation body separates a corrosive from the uplift anchor cable. The prestressed composite anchor cable uplift pile can avoid the problems that a steel strand cannot be placed into the bottom of a hole due to disorder in the hole entering process, the steel strand is prone to corrosion, and especially underground water at the lower part of a pile body enters concrete and causes corrosion due to tiny cracks generated by tensile stress; and the upper part of the pile body is always in a pressed state, so that the cracks are avoided, and the overall supporting performance of a pile cage is good.
本发明属于地下施工领域,具体涉及一种预应力复合锚索抗拔桩及其制备方法。预应力复合锚索抗拔桩,抗拔桩,其特征在于:包括:抗拔桩笼外壁,抗拔桩笼内壁,复合锚索,复合锚索设置在抗拔桩笼外壁和抗拔桩笼内壁之间,复合锚索由隔离体、设置在隔离体内的抗拔锚索组成,隔离体将腐蚀物和抗拔锚索隔开;填装物。本发明能够避免钢绞线入孔过程中会搅乱无法放入孔底,钢绞线容易被腐蚀、尤其是桩身下部地下水进入混凝土因拉应力产生微小裂缝导致的腐蚀的问题,桩身上部一直处于受压状态避免了裂缝产生,桩笼整体支撑性好。
Prestressed composite anchor cable uplift pile and preparation method thereof
一种预应力复合锚索抗拔桩及其制备方法
MAO ZONGYUAN (author) / YANG SHENGGUI (author) / DI DAOHUAI (author)
2020-12-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prestressed post-inserted composite anchor cable uplift pile and preparation method thereof
European Patent Office | 2020
|Non-prestress composite anchor cable uplift pile and preparation method thereof
European Patent Office | 2020
|Non-prestress post-inserted composite anchor cable uplift pile and preparation method thereof
European Patent Office | 2020
|Expanded-base type pre-stressed composite anchor cable uplift pile and preparation method thereof
European Patent Office | 2020
|Development of a New Uplift Pile with Prestressed Semi-Bonded Composite Anchor
DOAJ | 2022
|