A platform for research: civil engineering, architecture and urbanism
Fabricated leveling installation structure of waterproof wall surface
The invention relates to the technical field of wall surface leveling, and discloses a fabricated leveling installation structure of a waterproof wall surface. The fabricated leveling installation structure comprises a first fixing frame, a first supporting plate is fixedly connected to the surface of the first fixing frame, a first limiting groove is formed in one side of the first fixing frame,a first main fixing block is inserted into the first limiting groove, one side of the first main fixing block is fixedly connected with a first connecting rod, and the other side of the first connecting rod is movably connected with a second fixing frame through a first auxiliary fixing block. According to the fabricated leveling installation structure of the waterproof wall surface, a wedge, a threaded rod, a pull ring, a hole groove and waterproof wall plates are arranged, in order to prevent the wall surface from being uneven, the structure can be inserted into a gap in the surfaces of thewaterproof wall plates, the threaded rod is screwed to enable the two plates to be located on the same plane, when the wall surface is kept horizontal, the threaded rod is screwed again to be pulled out of the structure through the pull ring, therefore, work tasks are completed, time and labor are saved, and the work efficiency is greatly improved.
本发明涉及墙面调平技术领域,且公开了一种防水墙面的装配式调平安装结构,包括第一固定架,所述第一固定架的表面固定连接有第一支撑板,所述第一固定架的一侧开设有第一限位槽,所述第一限位槽的内部插接有第一主固定块,所述第一主固定块的一侧固定连接有第一连接杆,所述第一连接杆的另一侧通过第一副固定块活动连接有第二固定架。该防水墙面的装配式调平安装结构,楔子、螺纹杆、拉环、孔槽和防水墙板的设置,为防止墙面不平,可在防水墙板表面缝隙处插入该装置,拧动螺纹杆使得两板处于同一平面,当墙面保持水平时,再次拧动螺纹杆通过拉环抽出该装置,从而完成工作任务,省时省力,大大提高了工作效率。
Fabricated leveling installation structure of waterproof wall surface
The invention relates to the technical field of wall surface leveling, and discloses a fabricated leveling installation structure of a waterproof wall surface. The fabricated leveling installation structure comprises a first fixing frame, a first supporting plate is fixedly connected to the surface of the first fixing frame, a first limiting groove is formed in one side of the first fixing frame,a first main fixing block is inserted into the first limiting groove, one side of the first main fixing block is fixedly connected with a first connecting rod, and the other side of the first connecting rod is movably connected with a second fixing frame through a first auxiliary fixing block. According to the fabricated leveling installation structure of the waterproof wall surface, a wedge, a threaded rod, a pull ring, a hole groove and waterproof wall plates are arranged, in order to prevent the wall surface from being uneven, the structure can be inserted into a gap in the surfaces of thewaterproof wall plates, the threaded rod is screwed to enable the two plates to be located on the same plane, when the wall surface is kept horizontal, the threaded rod is screwed again to be pulled out of the structure through the pull ring, therefore, work tasks are completed, time and labor are saved, and the work efficiency is greatly improved.
本发明涉及墙面调平技术领域,且公开了一种防水墙面的装配式调平安装结构,包括第一固定架,所述第一固定架的表面固定连接有第一支撑板,所述第一固定架的一侧开设有第一限位槽,所述第一限位槽的内部插接有第一主固定块,所述第一主固定块的一侧固定连接有第一连接杆,所述第一连接杆的另一侧通过第一副固定块活动连接有第二固定架。该防水墙面的装配式调平安装结构,楔子、螺纹杆、拉环、孔槽和防水墙板的设置,为防止墙面不平,可在防水墙板表面缝隙处插入该装置,拧动螺纹杆使得两板处于同一平面,当墙面保持水平时,再次拧动螺纹杆通过拉环抽出该装置,从而完成工作任务,省时省力,大大提高了工作效率。
Fabricated leveling installation structure of waterproof wall surface
一种防水墙面的装配式调平安装结构
ZHOU CHEN (author) / LIU LONG (author) / SONG YONGFENG (author) / FENG YUSHUANG (author) / MA HUILING (author) / DING CHENSHENG (author)
2020-12-22
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Waterproof installation structure of fabricated curtain wall
European Patent Office | 2020
|Fabricated toilet ground leveling and waterproof structure
European Patent Office | 2024
|