A platform for research: civil engineering, architecture and urbanism
Composite wall structure of coke quenching tower chamber and construction method of composite wall structure
The invention discloses a composite wall structure of a coke quenching tower chamber and a construction method of the composite wall structure, and relates to the technical field of metallurgical coking engineering construction. The composite wall comprises a reinforced concrete wall constructed on the outer side of a wall body and a clinker brick wall which is built in a manner of being tightly attached to the inner side of the reinforced concrete wall, wherein wood pattern bricks are arranged on the clinker brick wall at intervals in the horizontal direction and the vertical direction of thecoke quenching tower chamber, and are embedded in the clinker brick wall; and a hole is drilled in the middle of each wood pattern brick, so that in the construction process of the composite wall, asplit screw arranged on the inner side of the clinker brick wall penetrates the holes of the wood pattern bricks to support a wood template on the outer side of the reinforced concrete wall. Through the implementation of the technical scheme, the technical problem that an existing coke quenching tower building structure is poor in reliability can be effectively solved; and the reinforced concrete-clinker brick composite wall construction technology is adopted, so that built coke quenching tower lining clinker bricks and reinforced concrete on the construction outer side are synchronously constructed, the clinker bricks and the reinforced concrete structure are tightly combined, and the integrity is good, the construction quality of a coke quenching tower is ensured, and the service life ofthe coke quenching tower is prolonged.
本发明公开了一种熄焦塔室复合墙结构及其施工方法,涉及冶金焦化工程施工技术领域;该复合墙包括施工于墙体外侧的钢筋混凝土墙和紧贴钢筋混凝土墙内侧砌筑的缸砖墙;缸砖墙沿熄焦塔室水平方向和垂直方向间隔设置有木模型砖,木模型砖镶砌于缸砖墙内,在木模型砖中部钻设有一孔洞,以使在复合墙施工过程中,通过设于缸砖墙内侧的对拉螺杆穿过木模型砖孔洞支设钢筋混凝土墙外侧的木模板,通过实施本技术方案,可有效解决现有熄焦塔砌筑结构可靠性差的技术问题,采用钢筋混凝土—缸砖复合墙施工工艺,使砌筑熄焦塔内衬缸砖及施工外侧钢筋混凝土同步进行施工,确保缸砖与钢筋混凝土结构结合紧密、整体性好,保证熄焦塔施工质量,提高熄焦塔使用寿命。
Composite wall structure of coke quenching tower chamber and construction method of composite wall structure
The invention discloses a composite wall structure of a coke quenching tower chamber and a construction method of the composite wall structure, and relates to the technical field of metallurgical coking engineering construction. The composite wall comprises a reinforced concrete wall constructed on the outer side of a wall body and a clinker brick wall which is built in a manner of being tightly attached to the inner side of the reinforced concrete wall, wherein wood pattern bricks are arranged on the clinker brick wall at intervals in the horizontal direction and the vertical direction of thecoke quenching tower chamber, and are embedded in the clinker brick wall; and a hole is drilled in the middle of each wood pattern brick, so that in the construction process of the composite wall, asplit screw arranged on the inner side of the clinker brick wall penetrates the holes of the wood pattern bricks to support a wood template on the outer side of the reinforced concrete wall. Through the implementation of the technical scheme, the technical problem that an existing coke quenching tower building structure is poor in reliability can be effectively solved; and the reinforced concrete-clinker brick composite wall construction technology is adopted, so that built coke quenching tower lining clinker bricks and reinforced concrete on the construction outer side are synchronously constructed, the clinker bricks and the reinforced concrete structure are tightly combined, and the integrity is good, the construction quality of a coke quenching tower is ensured, and the service life ofthe coke quenching tower is prolonged.
本发明公开了一种熄焦塔室复合墙结构及其施工方法,涉及冶金焦化工程施工技术领域;该复合墙包括施工于墙体外侧的钢筋混凝土墙和紧贴钢筋混凝土墙内侧砌筑的缸砖墙;缸砖墙沿熄焦塔室水平方向和垂直方向间隔设置有木模型砖,木模型砖镶砌于缸砖墙内,在木模型砖中部钻设有一孔洞,以使在复合墙施工过程中,通过设于缸砖墙内侧的对拉螺杆穿过木模型砖孔洞支设钢筋混凝土墙外侧的木模板,通过实施本技术方案,可有效解决现有熄焦塔砌筑结构可靠性差的技术问题,采用钢筋混凝土—缸砖复合墙施工工艺,使砌筑熄焦塔内衬缸砖及施工外侧钢筋混凝土同步进行施工,确保缸砖与钢筋混凝土结构结合紧密、整体性好,保证熄焦塔施工质量,提高熄焦塔使用寿命。
Composite wall structure of coke quenching tower chamber and construction method of composite wall structure
熄焦塔室复合墙结构及其施工方法
CHEN LEI (author) / TANG YINGJUN (author) / CHEN CHANGJUN (author) / LIANG MAO (author) / LIU YU (author)
2020-12-25
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|European Patent Office | 2018
|Composite retaining wall structure and construction method
European Patent Office | 2024
|European Patent Office | 2024
|