A platform for research: civil engineering, architecture and urbanism
Comprehensive utilization method of arid valley erosion gully
The invention discloses a comprehensive utilization method of an arid valley erosion gully. The method comprises the following steps that stepped soil preparation is carried out on the side wall and the bottom of the arid valley erosion gully at intervals along the gully edge line of the erosion gully to form a strip-shaped terrace land; the edges of the strip-shaped terrace land are raised to form ridges; and different crops are selectively planted on the strip-shaped terrace land, drought-enduring and barren-enduring plants are planted on the strip-shaped terrace land at intervals, and a plant screen is formed. The strip-shaped terrace land, the ridges and the plant screen in the gulley can prevent soil and nutrient substances in the erosion gulley from being eroded and taken away. The method has great significance in reducing erosion of the side wall and the bottom of the erosion gulley, meanwhile, the intercepted runoff and sediment can also provide better conditions for crop planting, agricultural production can be promoted easily, and economic benefits can be improved easily.
本发明公开了一种干旱河谷侵蚀沟综合利用方法,其方法为,在干旱河谷侵蚀沟侧壁及底部沿侵蚀沟的沟缘线间隔的进行梯级整地成条状梯地;将条状梯地的边缘起隆形成地埂;在条状梯地上选择性种植不同农作物,且间隔的在条状梯地上种植耐旱、耐贫瘠的植物,形成植物屏。沟内的条状梯地、地埂、植物屏能防止侵蚀沟内土壤及营养物质被侵蚀带走。对减小侵蚀沟侧壁和沟底的侵蚀意义重大,同时截流的径流和泥沙又可为农作物种植提供较好的条件,有助于促进农业生产和提升经济效益。
Comprehensive utilization method of arid valley erosion gully
The invention discloses a comprehensive utilization method of an arid valley erosion gully. The method comprises the following steps that stepped soil preparation is carried out on the side wall and the bottom of the arid valley erosion gully at intervals along the gully edge line of the erosion gully to form a strip-shaped terrace land; the edges of the strip-shaped terrace land are raised to form ridges; and different crops are selectively planted on the strip-shaped terrace land, drought-enduring and barren-enduring plants are planted on the strip-shaped terrace land at intervals, and a plant screen is formed. The strip-shaped terrace land, the ridges and the plant screen in the gulley can prevent soil and nutrient substances in the erosion gulley from being eroded and taken away. The method has great significance in reducing erosion of the side wall and the bottom of the erosion gulley, meanwhile, the intercepted runoff and sediment can also provide better conditions for crop planting, agricultural production can be promoted easily, and economic benefits can be improved easily.
本发明公开了一种干旱河谷侵蚀沟综合利用方法,其方法为,在干旱河谷侵蚀沟侧壁及底部沿侵蚀沟的沟缘线间隔的进行梯级整地成条状梯地;将条状梯地的边缘起隆形成地埂;在条状梯地上选择性种植不同农作物,且间隔的在条状梯地上种植耐旱、耐贫瘠的植物,形成植物屏。沟内的条状梯地、地埂、植物屏能防止侵蚀沟内土壤及营养物质被侵蚀带走。对减小侵蚀沟侧壁和沟底的侵蚀意义重大,同时截流的径流和泥沙又可为农作物种植提供较好的条件,有助于促进农业生产和提升经济效益。
Comprehensive utilization method of arid valley erosion gully
一种干旱河谷侵蚀沟综合利用方法
YANG DAN (author) / LIU SHOUJIANG (author) / LUO MINGLIANG (author) / ZHANG BIN (author) / LUO JUN (author) / LYU WEI (author) / HE YULI (author) / WANG LEI (author)
2020-12-29
Patent
Electronic Resource
Chinese
Erosion gully treatment method for gully leveling and farmland building
European Patent Office | 2023
|Gully head protection structure for developing erosion gully and construction method thereof
European Patent Office | 2020
|