A platform for research: civil engineering, architecture and urbanism
The invention discloses a concrete sheet water stop reinforcing method, and relates to the technical field of form reinforcing. The concrete sheet water stop reinforcing method comprises the followingsteps that a water stop screw rod is manufactured, a plastic gasket is fixed to an aluminum form, the form is arranged through the water stop screw rod, the form is fixed, the form is dismounted, theexposed portion of the screw rod is treated, and a rabbet is blocked and treated. According to the method, in a housing construction project adopting an aluminum form process, if relatively thin or thick wall, plate and other component forms needing waterproof reinforcing exist, and if no finished water stop screw rod with the corresponding size exists, the water stop screw rod can be produced through the method, and the process of adding a plastic groove pressing sheet on the aluminum form for reinforcement is matched, so that the screw rod hole plugging construction can be facilitated, thelater leakage probability can be reduced, and the construction quality is improved.
本发明公开是关于一种混凝土薄板止水加固方法,涉及模板加固技术领域。混凝土薄板止水加固方法包括以下步骤:制作止水丝杆,在铝模上固定塑料垫片,使用止水丝杆对模板进行安装,对模板进行固定,对模板进行拆除,处理外露丝杆,封堵处理企口。采用铝模工艺的房建项目中,若是存在需要采用防水加固的较薄或较厚的墙、板等构件模板,若无相应尺寸的成品止水丝杆的,均可采用本发明生产该种止水丝杆,配合铝模增加塑料压槽片的工艺进行加固,从而既可以方便丝杆洞封堵施工,也可以减小后期渗漏概率,提高施工质量。
The invention discloses a concrete sheet water stop reinforcing method, and relates to the technical field of form reinforcing. The concrete sheet water stop reinforcing method comprises the followingsteps that a water stop screw rod is manufactured, a plastic gasket is fixed to an aluminum form, the form is arranged through the water stop screw rod, the form is fixed, the form is dismounted, theexposed portion of the screw rod is treated, and a rabbet is blocked and treated. According to the method, in a housing construction project adopting an aluminum form process, if relatively thin or thick wall, plate and other component forms needing waterproof reinforcing exist, and if no finished water stop screw rod with the corresponding size exists, the water stop screw rod can be produced through the method, and the process of adding a plastic groove pressing sheet on the aluminum form for reinforcement is matched, so that the screw rod hole plugging construction can be facilitated, thelater leakage probability can be reduced, and the construction quality is improved.
本发明公开是关于一种混凝土薄板止水加固方法,涉及模板加固技术领域。混凝土薄板止水加固方法包括以下步骤:制作止水丝杆,在铝模上固定塑料垫片,使用止水丝杆对模板进行安装,对模板进行固定,对模板进行拆除,处理外露丝杆,封堵处理企口。采用铝模工艺的房建项目中,若是存在需要采用防水加固的较薄或较厚的墙、板等构件模板,若无相应尺寸的成品止水丝杆的,均可采用本发明生产该种止水丝杆,配合铝模增加塑料压槽片的工艺进行加固,从而既可以方便丝杆洞封堵施工,也可以减小后期渗漏概率,提高施工质量。
Repairing and reinforcing structure method for concrete Building using Reinforcing sheet
European Patent Office | 2022
|