A platform for research: civil engineering, architecture and urbanism
Beam-containing building top plate bottom formwork supporting system
The invention discloses a beam-containing building top plate bottom formwork supporting system. The beam-containing building top plate bottom formwork supporting system comprises a top plate bottom formwork supporting part and a beam bottom supporting part, the building top plate bottom formwork supporting part is of a beam-beam supporting structure composed of a main beam, a secondary beam and adjustable supporting columns, and the beam bottom supporting part is provided with a beam bottom formwork joist; and the beam bottom formwork joist forms a hanging bracket structure through two screw rod type hanging rods distributed at the two ends of the beam bottom formwork joist, and the beam bottom supporting part is also borne by the adjustable supporting columns. The beam-containing buildingtop plate bottom formwork supporting system has the beneficial effects that the erecting workload of the supporting system is remarkably reduced, the erecting cost is saved, and the erecting efficiency is improved; and by utilizing the advantage of being closer to the top surface of a building top plate bottom formwork support, the convenience and the construction efficiency of the height adjustment operation of the beam bottom formwork supporting part are effectively improved, and the purpose of reducing the construction cost is achieved from two aspects.
本发明公开了一种含梁楼顶板底模支撑体系,包括顶板底模支撑部分和梁底支撑部分,楼顶板底模支撑部分由主梁、次梁和可调支柱构成梁梁支撑结构,梁底支撑部分具有梁底模托梁;梁底模托梁通过分布在其两端的两个螺杆型吊杆形成吊架结构,梁底支撑部分也由可调支柱承载。本发明的有益效果是,显著减少支撑体系的搭设工作量,节省了搭设成本,提高了搭设效率;并利用更靠近楼顶板底模支撑顶面的优势,有效提高梁底模支撑部分高度调节操作的方便性和施工效率,从两个方面实现了降低施工成本的目的。
Beam-containing building top plate bottom formwork supporting system
The invention discloses a beam-containing building top plate bottom formwork supporting system. The beam-containing building top plate bottom formwork supporting system comprises a top plate bottom formwork supporting part and a beam bottom supporting part, the building top plate bottom formwork supporting part is of a beam-beam supporting structure composed of a main beam, a secondary beam and adjustable supporting columns, and the beam bottom supporting part is provided with a beam bottom formwork joist; and the beam bottom formwork joist forms a hanging bracket structure through two screw rod type hanging rods distributed at the two ends of the beam bottom formwork joist, and the beam bottom supporting part is also borne by the adjustable supporting columns. The beam-containing buildingtop plate bottom formwork supporting system has the beneficial effects that the erecting workload of the supporting system is remarkably reduced, the erecting cost is saved, and the erecting efficiency is improved; and by utilizing the advantage of being closer to the top surface of a building top plate bottom formwork support, the convenience and the construction efficiency of the height adjustment operation of the beam bottom formwork supporting part are effectively improved, and the purpose of reducing the construction cost is achieved from two aspects.
本发明公开了一种含梁楼顶板底模支撑体系,包括顶板底模支撑部分和梁底支撑部分,楼顶板底模支撑部分由主梁、次梁和可调支柱构成梁梁支撑结构,梁底支撑部分具有梁底模托梁;梁底模托梁通过分布在其两端的两个螺杆型吊杆形成吊架结构,梁底支撑部分也由可调支柱承载。本发明的有益效果是,显著减少支撑体系的搭设工作量,节省了搭设成本,提高了搭设效率;并利用更靠近楼顶板底模支撑顶面的优势,有效提高梁底模支撑部分高度调节操作的方便性和施工效率,从两个方面实现了降低施工成本的目的。
Beam-containing building top plate bottom formwork supporting system
一种含梁楼顶板底模支撑体系
ZHANG JIANHUA (author) / MENG XIANHUA (author) / SHEN CHANGSHENG (author) / HE LING (author) / YAN YANMEI (author) / MIAO XIANG (author)
2021-01-01
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate
European Patent Office | 2023
|Welded floor-free plate buckle scaffold for supporting beam bottom formwork
European Patent Office | 2023
|