A platform for research: civil engineering, architecture and urbanism
Building pile foundation and construction process thereof
The invention relates to a building pile foundation and a construction process thereof. The building pile foundation comprises a plurality of pile foundation bodies inserted into soil around a pile and a bearing platform arranged at the tops of the multiple pile foundation bodies, wherein each pile foundation body comprises a bottom pile and a top pile located on the bottom pile; a plurality of containing grooves are formed in the top face of each bottom pile; inverted fasteners are arranged in the containing grooves; each top pile comprises a connecting base and an inserting base arranged onthe face, facing the corresponding bottom pile, of the connecting base; the inserting bases are used for driving the inverted fasteners to stretch out of the containing grooves and be inserted into the soil around the pile; the top piles and the bottom piles are fixed through reinforcing assemblies; each pile foundation body is provided with a holding assembly; and the holding assemblies of everytwo adjacent pile foundation bodies are connected through a chain assembly. According to the building pile foundation and the construction process thereof, the inverted fasteners of the pile foundation bodies are inserted into the soil around the pile, the connecting strength of the soil around the pile and the pile foundation bodies is enhanced, and the bearing strength of the pile foundation bodies is improved overall.
本申请涉及一种建筑桩基础及其施工工艺,其包括多个插设于桩周土的桩基和设置于多个桩基顶部的承台,桩基包括底桩和位于底桩上的顶桩,底桩顶面开设有若干容置槽,容置槽内设置有倒扣件,顶桩包括连接座和设置于连接座朝向底桩一面的插座,插座用于驱动倒扣件伸出容置槽且插入桩周土,顶桩和底桩通过加固组件相固定,桩基设置有抱紧组件,相邻两个桩基的抱紧组件通过锁链组件相连接。本申请利用桩基的倒扣件插入桩周土内部,加强桩周图与桩基的连接强度,整体提高桩基的承载力度。
Building pile foundation and construction process thereof
The invention relates to a building pile foundation and a construction process thereof. The building pile foundation comprises a plurality of pile foundation bodies inserted into soil around a pile and a bearing platform arranged at the tops of the multiple pile foundation bodies, wherein each pile foundation body comprises a bottom pile and a top pile located on the bottom pile; a plurality of containing grooves are formed in the top face of each bottom pile; inverted fasteners are arranged in the containing grooves; each top pile comprises a connecting base and an inserting base arranged onthe face, facing the corresponding bottom pile, of the connecting base; the inserting bases are used for driving the inverted fasteners to stretch out of the containing grooves and be inserted into the soil around the pile; the top piles and the bottom piles are fixed through reinforcing assemblies; each pile foundation body is provided with a holding assembly; and the holding assemblies of everytwo adjacent pile foundation bodies are connected through a chain assembly. According to the building pile foundation and the construction process thereof, the inverted fasteners of the pile foundation bodies are inserted into the soil around the pile, the connecting strength of the soil around the pile and the pile foundation bodies is enhanced, and the bearing strength of the pile foundation bodies is improved overall.
本申请涉及一种建筑桩基础及其施工工艺,其包括多个插设于桩周土的桩基和设置于多个桩基顶部的承台,桩基包括底桩和位于底桩上的顶桩,底桩顶面开设有若干容置槽,容置槽内设置有倒扣件,顶桩包括连接座和设置于连接座朝向底桩一面的插座,插座用于驱动倒扣件伸出容置槽且插入桩周土,顶桩和底桩通过加固组件相固定,桩基设置有抱紧组件,相邻两个桩基的抱紧组件通过锁链组件相连接。本申请利用桩基的倒扣件插入桩周土内部,加强桩周图与桩基的连接强度,整体提高桩基的承载力度。
Building pile foundation and construction process thereof
一种建筑桩基础及其施工工艺
YAO ZIJIAN (author) / CHEN JIAXIN (author) / TANG HAIJING (author)
2021-01-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile cutting device in green building pile foundation construction process
European Patent Office | 2021
|Soft soil area foundation composite pile foundation and pile foundation construction process thereof
European Patent Office | 2021
|Building pile foundation structure and construction method thereof
European Patent Office | 2023
|