A platform for research: civil engineering, architecture and urbanism
Maintenance device after concrete pouring in building construction
The invention relates to a maintenance device after concrete pouring in building construction. The maintenance device comprises a rack, a water spraying device, a lifting device and a walking device,wherein the lifting device comprises a guide rail plate arranged on the left side of the upper surface of the rack, a nut slidably connected with the guide rail plate, a lead screw, a support and a transmission motor; and the water spraying device comprises a water tank arranged on the rack, a base arranged on the upper surface of the nut, a high-pressure water pump fixedly connected with the base, a vertical pipe communicating with a water outlet of the high-pressure water pump, a transverse pipe, a transverse short vertical pipe, a water mist spray head, a filter communicating with a water inlet of the high-pressure water pump, and a water suction pipe with one end communicating with the filter. The walking device comprises wheels and a handle. According to the maintenance device after concrete pouring in building construction, consumption of manpower and material resources in the maintenance process can be reduced, the uniformity of water spraying is ensured, the working efficiencyis improved, and the construction quality is ensured.
本发明涉及一种建筑施工混凝土浇筑后养护装置,包括机架、喷水装置、升降装置、以及行走装置;所述升降装置包括设置在机架上表面左侧的导轨板、与所述导轨板滑动连接的丝母、丝杠、支架以及与传动电机;所述喷水装置包括设置在所述机架上的水箱、设置在所述丝母上表面的底座、与所述底座固定连接的高压水泵、与高压水泵出水口连通的竖管、横管、与所述横短立管、水雾喷头、与所述高压水泵进水口连通的过滤器以及一端与所述过滤器连通的吸水管;所述行走装置包括车轮和把手。本发明能够减少养护过程中人力和物力的消耗,保证喷水的均匀性,提高了工作效率,保障了施工质量。
Maintenance device after concrete pouring in building construction
The invention relates to a maintenance device after concrete pouring in building construction. The maintenance device comprises a rack, a water spraying device, a lifting device and a walking device,wherein the lifting device comprises a guide rail plate arranged on the left side of the upper surface of the rack, a nut slidably connected with the guide rail plate, a lead screw, a support and a transmission motor; and the water spraying device comprises a water tank arranged on the rack, a base arranged on the upper surface of the nut, a high-pressure water pump fixedly connected with the base, a vertical pipe communicating with a water outlet of the high-pressure water pump, a transverse pipe, a transverse short vertical pipe, a water mist spray head, a filter communicating with a water inlet of the high-pressure water pump, and a water suction pipe with one end communicating with the filter. The walking device comprises wheels and a handle. According to the maintenance device after concrete pouring in building construction, consumption of manpower and material resources in the maintenance process can be reduced, the uniformity of water spraying is ensured, the working efficiencyis improved, and the construction quality is ensured.
本发明涉及一种建筑施工混凝土浇筑后养护装置,包括机架、喷水装置、升降装置、以及行走装置;所述升降装置包括设置在机架上表面左侧的导轨板、与所述导轨板滑动连接的丝母、丝杠、支架以及与传动电机;所述喷水装置包括设置在所述机架上的水箱、设置在所述丝母上表面的底座、与所述底座固定连接的高压水泵、与高压水泵出水口连通的竖管、横管、与所述横短立管、水雾喷头、与所述高压水泵进水口连通的过滤器以及一端与所述过滤器连通的吸水管;所述行走装置包括车轮和把手。本发明能够减少养护过程中人力和物力的消耗,保证喷水的均匀性,提高了工作效率,保障了施工质量。
Maintenance device after concrete pouring in building construction
一种建筑施工混凝土浇筑后养护装置
ZHAO DONGMEI (author) / CHEN LEI (author) / SU YAFEI (author) / WANG ZHAOHU (author) / ZHANG XINSHENG (author) / ZHANG JIE (author)
2021-01-05
Patent
Electronic Resource
Chinese
Concrete pouring construction and maintenance method for house building
European Patent Office | 2024
|Automatic concrete pouring device for building construction
European Patent Office | 2021
|