A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of rail transit equipment, and particularly relates to an urban rail transit rail quick connecting device which comprises a first guide rail and a second guide rail, one end of the first guide rail is slidably inserted into the surface of one end of the second guide rail, and the two ends of the first guide rail and the two ends of the second guide railare provided with a first clamping groove and an adjusting cavity correspondingly. And a second clamping groove is formed in the inner top wall of the first clamping groove, the inner wall of the second clamping groove is perpendicular to the inner wall of the first clamping groove, and a rapid mounting device is arranged in the adjusting cavity. According to the quick connecting device, the rapid mounting device is arranged in an adjusting cavity and comprises an adjusting rod, so that during mounting operation, rapid mounting, locking and fixing can be achieved, operation is easy, mountingand dismounting are easy and convenient, and two guide rails can be rapidly controlled to be firmly connected; and dangers caused by derailing after long-term use are avoided.
本发明属于轨道交通设备技术领域,尤其是一种城市轨道交通铁轨快速连接装置,包括第一导轨和第二导轨,所述第一导轨的一端和第二导轨的一端表面滑动插接,所述第一导轨的两端和第二导轨的两端分别开设有第一卡接槽和调节腔,所述第一卡接槽的内顶壁开设有第二卡接槽,所述第二卡接槽的内壁与第一卡接槽的内壁垂直,所述调节腔的内部设置有快速安装装置。该城市轨道交通铁轨快速连接装置,通过设置所述调节腔的内部设置有快速安装装置,所述快速安装装置包括有调节杆,从而达到了安装操作时,可以快速安装锁紧固定,操作简单,安装拆卸简便,能快速控制两个导轨连接牢靠,避免长期使用脱轨造成危险的效果。
The invention belongs to the technical field of rail transit equipment, and particularly relates to an urban rail transit rail quick connecting device which comprises a first guide rail and a second guide rail, one end of the first guide rail is slidably inserted into the surface of one end of the second guide rail, and the two ends of the first guide rail and the two ends of the second guide railare provided with a first clamping groove and an adjusting cavity correspondingly. And a second clamping groove is formed in the inner top wall of the first clamping groove, the inner wall of the second clamping groove is perpendicular to the inner wall of the first clamping groove, and a rapid mounting device is arranged in the adjusting cavity. According to the quick connecting device, the rapid mounting device is arranged in an adjusting cavity and comprises an adjusting rod, so that during mounting operation, rapid mounting, locking and fixing can be achieved, operation is easy, mountingand dismounting are easy and convenient, and two guide rails can be rapidly controlled to be firmly connected; and dangers caused by derailing after long-term use are avoided.
本发明属于轨道交通设备技术领域,尤其是一种城市轨道交通铁轨快速连接装置,包括第一导轨和第二导轨,所述第一导轨的一端和第二导轨的一端表面滑动插接,所述第一导轨的两端和第二导轨的两端分别开设有第一卡接槽和调节腔,所述第一卡接槽的内顶壁开设有第二卡接槽,所述第二卡接槽的内壁与第一卡接槽的内壁垂直,所述调节腔的内部设置有快速安装装置。该城市轨道交通铁轨快速连接装置,通过设置所述调节腔的内部设置有快速安装装置,所述快速安装装置包括有调节杆,从而达到了安装操作时,可以快速安装锁紧固定,操作简单,安装拆卸简便,能快速控制两个导轨连接牢靠,避免长期使用脱轨造成危险的效果。
Urban rail transit rail quick connecting device
一种城市轨道交通铁轨快速连接装置
WU PAN (author)
2021-01-15
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
/
G01H
MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
,
Messen von mechanischen Schwingungen oder Ultraschall-, Schall- oder Infraschallwellen
/
G01L
Messen von Kraft, mechanischer Spannung, Drehmoment, Arbeit, mechanischer Leistung, mechanischem Wirkungsgrad oder des Drucks von Fluiden
,
MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
/
G01M
TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES
,
Prüfen der statischen oder dynamischen Massenverteilung rotierender Teile von Maschinen oder Konstruktionen